Columns, beams, slabs and walls carry the loads of a building. When they crack, spall or lose steel to corrosion, repairs must restore their strength, not just their appearance. That means engineering input from the start.
Common problems
- Corroded reinforcement in car park columns and beams. See car park repairs.
- Cracking from overloading, movement or shrinkage.
- Spalling at slab edges and soffits. See slab edge repairs.
- Damage from impact, such as vehicles hitting columns.
- Poor original construction, such as honeycombing or low cover.

The process
- Investigation: visual survey, testing and opening up where needed.
- Engineering design: repair method, materials and any strengthening.
- Propping: temporary supports where repairs remove load-bearing concrete.
- Repair: break-out, steel treatment or replacement, reinstatement.
- Inspection: hold points signed off by the engineer.
- Protection: coatings and fixing the cause of the damage.
Repair methods
- Hand-applied repair mortars for smaller areas.
- Formed and poured repairs for larger sections.
- Sprayed concrete for large areas in some situations.
- Epoxy injection to bond structural cracks. See crack injection.
- Strengthening with carbon fibre or steel. See carbon fibre strengthening.
Working in occupied buildings
Car parks and buildings usually stay in use. Works are staged, with propping, exclusion zones and noise and dust control.
Compliance
Structural repairs on apartment buildings are generally regulated under the DBP Act. See our Class 2 builder page.
How proper repair helps
Structural repairs done to an engineer's design restore safety and strength, and give owners and insurers confidence.
Structural concrete repairs
We carry out structural concrete repairs with engineers across Sydney. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
Do structural concrete repairs need an engineer?
Yes. Repairs to columns, beams and slabs should be designed and inspected by a structural engineer.
Can a car park stay open during column repairs?
Usually, with staging, propping and exclusion zones around the work.
How are structural cracks in concrete repaired?
Often by epoxy injection to bond the crack, with strengthening where the engineer requires it.