Sometimes a concrete slab, beam or column needs to carry more than it was designed for, or has lost strength through damage or corrosion. The traditional answer is steel: new beams, plates or propping. In many buildings today, engineers specify carbon fibre reinforced polymer (CFRP) instead.
What carbon fibre strengthening is
CFRP comes as thin strips (laminates), flexible sheets or fabric wraps made of carbon fibres set in resin. Bonded to the surface of concrete with a structural epoxy adhesive, it acts as extra tensile reinforcement on the outside of the member. It is very strong for its weight and only a few millimetres thick.

When engineers use it
- Slabs that need more capacity, for example where a new load such as a pool, planter or plant equipment is added.
- Beams and slabs with design or construction defects, such as missing or misplaced reinforcement found during defect investigations.
- Openings cut in slabs, for new stairs, lifts or services, where the slab around them needs strengthening.
- Columns, where wrapping with carbon fibre fabric can increase capacity and confinement.
- After concrete cancer repairs, where steel has lost section and the engineer wants to restore capacity.
Why it is popular in occupied buildings
- Light and thin. It adds almost no weight and barely changes ceiling heights or finishes.
- Less disruption. No heavy steel to lift in, and usually less propping and demolition.
- Corrosion resistant. Carbon fibre does not rust, which suits car parks and coastal buildings.
- Fast. Installation is often quicker than steel alternatives once the surface is prepared.
The process
- Engineering design. A structural engineer calculates the strengthening needed and specifies the system, layout and details.
- Concrete repair first. Any cracked, spalled or carbonated concrete is repaired, because CFRP is only as good as the concrete it is bonded to.
- Surface preparation. The concrete is ground or blasted to a clean, sound surface. Corners on beams and columns are rounded for wraps.
- Bonding. Primer and epoxy adhesive are applied and the laminates or sheets are installed, pressed in and rolled to remove air.
- Testing and protection. Bond can be checked by pull-off testing or tapping. A protective coating or fire protection is applied where specified.
Limits to be aware of
- It is not a fix for corrosion. If the cause of concrete cancer is not treated, the steel keeps rusting behind the carbon fibre.
- Fire. The adhesive softens at high temperatures, so engineers consider fire ratings and may require fire protection.
- Sound concrete is essential. Very weak or badly damaged concrete may not provide enough bond.
- It needs design. It is not a product to apply by eye. For load-bearing elements in a Class 2 building, the design is a regulated design under the DBP Act.
Carbon fibre or steel?
Neither is always better. Steel can still be the right answer where large loads are involved, where fire protection of CFRP is hard to achieve, or where a steel member is being replaced anyway. Your engineer weighs strength, fire, cost and disruption.
Structural strengthening in Sydney
We carry out structural remediation to engineers' designs, including concrete repairs, steel strengthening and carbon fibre installation by specialist applicators. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
What is carbon fibre strengthening?
Thin carbon fibre strips, sheets or wraps bonded to concrete with structural epoxy, acting as extra reinforcement on the outside of a slab, beam or column.
Is carbon fibre stronger than steel?
For its weight, carbon fibre has a very high tensile strength. Whether it is the better choice depends on the loads, fire requirements and the condition of the concrete, which an engineer assesses.
Does carbon fibre strengthening need an engineer?
Yes. The amount and layout must be designed by a structural engineer, and on Class 2 buildings in NSW it is regulated design work under the DBP Act.