Many apartment towers have floor-to-ceiling aluminium windows or window walls instead of traditional brick walls. They give great views, but when they leak the water can be hard to trace. It often shows up as wet carpet, swollen skirting, stains or mould around the frame.
Common causes
- Failed perimeter sealant: the joint between frame and building dries out, cracks or pulls away. See failed sealants.
- Blocked weep holes: frames are designed to collect water and drain it out. Blocked drains make water back up and spill inside.
- Failed sill flashings: if the detail below the frame fails or was missed, water goes straight into the slab or carpet.
- Corner and mullion joints: frame joints can open up over time as buildings move.
- Gaskets and glazing seals: rubber shrinks and perishes with age and sun.
- Slab edge problems: sometimes the frame is fine, and water is coming through the concrete or from a balcony above.

Why more silicone often fails
Face-sealing every joint can block the drainage paths the frame relies on, trapping water inside and making the leak worse. It may also make the actual fault harder to find later.
How leaks are diagnosed
- Map where and when water appears, including wind direction and rain.
- Inspect seals, drainage and frames, from inside and at the facade.
- Water test one area at a time, working from the bottom up to isolate the source.
- Open up a sample section if needed to check the sill and flashing.
Repair options
- Clearing and restoring weep holes and drainage.
- Replacing perished gaskets and glazing seals.
- Removing failed sealants and resealing correctly with the right product and joint design.
- Removing and reinstating frames to fix sill flashings.
- Replacing frames in severe cases, or where they have reached the end of their life.
Who is responsible in strata?
Windows and external walls are often common property, but this can vary between strata plans and by-laws. Sliding doors are a similar case: see sliding doors leaking onto balconies and leaking windows.
How the right repair helps
A proper fix stops ongoing damage to carpet, plaster and joinery, reduces mould risk and can avoid repeated callouts for the same leak.
Window leak investigations
We test, trace and repair window and facade leaks on Sydney apartment and commercial buildings. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
Why does my apartment window leak only in storms?
Wind-driven rain pushes water into joints and can overwhelm blocked drainage. That is why leaks often appear only with rain from one direction.
Can a leaking window be fixed with silicone?
Rarely for long. Silicone can block the drainage system in the frame, and it will not fix a failed sill or flashing.
Who pays to fix a leaking apartment window?
It depends on the strata plan and by-laws. External windows are often common property, but your strata manager should confirm this.


