Windows that leak in heavy or wind-driven rain are a common complaint in Sydney homes and apartments. The water may come through the window itself, or around it through the wall.
Common causes
- Blocked weep holes in the window track, so water cannot drain out.
- Failed seals and gaskets around glass and sashes.
- Open frame joints at corners.
- Missing or failed sill flashings under the window.
- Failed perimeter sealant between the frame and the wall. See failed sealants.
- Cracked render or failed head flashings above the window.
- Windows not rated for the wind and water exposure, common on high or coastal buildings.
How window leaks are tested
Water testing in stages, from the bottom up: first the sill and track, then frame joints, then the perimeter and wall above. Testing one area at a time finds the real source instead of sealing everything.
Repairs
- Clean tracks and weep holes.
- Replace seals and gaskets, and seal frame joints.
- Remove and re-seal the perimeter with the right sealant and backing rod.
- Install sill and head flashings, which may mean removing and reinstalling the window.
- Repair render and facade cracks around the opening.
- Replace windows that are not fit for the exposure.
Leaks that look like window leaks
Water appearing at a window head can come from a balcony, parapet or wall above. See balcony leak detection.
Strata buildings
Windows in external walls are often common property in NSW strata. See who is responsible for strata repairs.
Window leak repairs
See our waterproofing service or call 0415 840 500.
Frequently asked questions
Why do my windows leak only in heavy rain?
Wind-driven rain pushes water past worn seals, blocked weep holes, open frame joints and failed perimeter sealant.
How do you find where a window is leaking?
By water testing in stages: the sill and track, then frame joints, then the perimeter and the wall above.
Can a leaking window be fixed without replacing it?
Often. Cleaning weep holes, replacing seals and resealing the perimeter fixes many leaks. Missing flashings may need the window removed and reinstalled.


