Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Bronte ยท Eastern Suburbs Balcony & strata remedial builders in Bronte.

Balcony repairs, waterproofing and concrete cancer repair for Bronte apartment blocks, semis and homes on the slopes above the beach. Licensed, DBP registered and engineer-led.

  • Free inspection in Bronte
  • Itemised written quote
  • Class 2 and strata experience
  • Licensed builder 384697C
  • DBP registered BUP4254812
  • Photos and records for your strata
Talk directly with the builder0415 840 500

Free inspection in Bronte

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Inspection in Bronte
DBP
Registered for Class 2 work
$20M
Public liability insurance cover
Remedial building in Bronte

Steep streets that run straight down to the sea.

Bronte is a small suburb of steep streets around Bronte Park and the beach, with Federation and inter-war houses, semis and a scattering of walk-up apartment blocks, many with balconies turned towards the ocean.

The slope works against these buildings. Runoff from the street above collects against back walls and retaining walls, while the front elevations take the salt and the southerly storms. We are most often called about balcony leaks, damp lower floors and concrete cancer on balcony edges.

Common problems we fix in Bronte

  • Leaking balconies on ocean-facing walk-ups
  • Damp lower floors and back walls on sloping blocks
  • Concrete cancer on balcony edges and hobs
  • Failed render and paint from salt exposure
  • Blocked drainage behind retaining walls
Structural steel replacement by METCON
BronteEastern Suburbs

Bronte at a glance

RegionEastern Suburbs
CouncilWaverley Council
Building classClass 2 apartments, strata and homes
InspectionFree, usually within a few days

Some Bronte streets and buildings are heritage listed or sit in conservation areas, so visible changes to facades and balconies may need council approval.

Remedial services in Bronte

One builder for the whole problem.

Leaking balconies cause concrete cancer, failed render lets water into walls. We fix the cause and the damage, so you deal with one licensed builder.

Why METCON

Strata remedial work, done once.

We work to your engineer's or consultant's specification, photograph every hold point and hand over the records your strata committee, insurer and future buyers will ask for. For Class 2 buildings we handle the DBP Act requirements with your design practitioner.

You deal directly with the builder, from the first inspection in Bronte to the final flood test and handover.

Principal Contractor
Meteora Constructions Pty Ltd
Builder Licence384697C
DBP RegistrationBUP4254812
Demolition LicenceAD214430
Public Liability$20M
ServicingBronte and Eastern Suburbs
ABN 89 151 074 421
What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from strata buildings and homeowners.

I couldn't be more pleased that I found Constatine and his team to assist our strata building with landscaping, waterproofing, and concrete cancer repairs. He was knowledgeable, reliable, patient, and deeply committed to achieving the best result for everyone involved. I am 100% confident that the work completed will stand the test of time. He will absolutely be my go-to moving forward, and I have no doubt we will work together again.
JJodi Cremorne
Constatine and his team did an excellent job repairing and waterproofing our garage ceiling and walls, which had been affected by concrete cancer and sandstone erosion. Constatine is highly experienced in remedial works and provided clear advice, transparent costings, and recommended the best products available to ensure a long-lasting result. We highly recommend METCON for specialist remedial works.
JJames Cremorne
My partner and I own an original 1920s semi-detached home in Vaucluse, with complex sandstone foundations and multiple structural challenges caused by previous defective works. After years of delays, failed consultants, and no progress, I met Constatine and his team. From the beginning, I was impressed by the detailed review of our plans and the identification of numerous discrepancies that previous builders had missed. The team supported us through lengthy council negotiations, neighbour consultations, and COVID-related delays, even before contracts were signed. Once construction commenced, Constatine and the Meteora Constructions team were exceptional. Progress remained on schedule despite heavy rain, unforeseen structural issues, and highly complex underpinning works that previous builders had refused to undertake. They completed the work efficiently and at significantly less cost than other builders had quoted. I cannot speak highly enough of Constatine and METCON Remedial Services. It is no understatement to say that engaging Constatine and his team saved not only our project, but probably our marriage as well.
SBSteven Brown Vaucluse
Helpful guides

Know more before you start.

Plain-language guides for owners and strata committees.

Bronte FAQ

Remedial building in Bronte: questions.

Straight answers from the builder. Anything else, just call.

Retaining Walls in Bronte
Why is the back wall of my Bronte apartment always damp?

On a steep site, groundwater and runoff from the properties above sit against the back wall. If there is no working drainage or tanking, moisture comes through. The fix is usually better drainage combined with new waterproofing or a damp treatment.

Do you do balcony repairs and waterproofing in Bronte?

Yes. We repair and re-waterproof balconies, terraces, podiums and wet areas on Bronte apartment buildings and homes, and repair concrete cancer and balustrades at the same time where needed.

Are you registered for Class 2 apartment work in Bronte?

Yes. METCON is a licensed builder (384697C) and a registered building practitioner under the Design and Building Practitioners Act (BUP4254812), so we can carry out remedial work on Class 2 apartment buildings.

Do remedial works in Bronte need council approval?

Many repairs are maintenance and do not, but some works can. Some Bronte streets and buildings are heritage listed or sit in conservation areas, so visible changes to facades and balconies may need council approval. The council is Waverley Council. We check what applies before quoting.

How much do remedial repairs cost in Bronte?

It depends on what is under the tiles or render, access and the size of the job. We inspect, test where needed and give an itemised quote, with rates for anything hidden.

Nearby areas

Also servicing near Bronte.

We work right across Eastern Suburbs and the rest of Sydney. See all service areas.

Leaking balcony or concrete cancer in Bronte?

Free inspection and a straight answer from a licensed, DBP registered Sydney builder.

Call now Free Quote