Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

North Bondi ยท Eastern Suburbs Balcony & strata remedial builders in North Bondi.

Balcony repairs, waterproofing and concrete cancer repair for North Bondi apartment blocks and homes, from the streets above the beach to the headland. Licensed, DBP registered and engineer-led.

  • Free inspection in North Bondi
  • Itemised written quote
  • Class 2 and strata experience
  • Licensed builder 384697C
  • DBP registered BUP4254812
  • Photos and records for your strata
Talk directly with the builder0415 840 500

Free inspection in North Bondi

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Inspection in North Bondi
DBP
Registered for Class 2 work
$20M
Public liability insurance cover
Remedial building in North Bondi

Elevated, exposed and close to the sea.

North Bondi's apartment blocks and homes climb the slopes above the beach and the Ben Buckler headland. Many walk-up blocks have balconies facing straight out to the ocean.

That exposure brings wind-driven rain against windows and balcony doors, salt build-up on concrete and steel, and heavy runoff on sloping sites. Balcony waterproofing, door threshold leaks and concrete cancer are the repairs we are asked about most.

Common problems we fix in North Bondi

  • Balcony door and threshold leaks in wind-driven rain
  • Concrete cancer on ocean-facing balconies
  • Water through brick walls and parapets
  • Drainage problems on sloping sites
  • Failed sealants around windows
Corroded reinforcement exposed for treatment by METCON
North BondiEastern Suburbs

North Bondi at a glance

RegionEastern Suburbs
CouncilWaverley Council
Building classClass 2 apartments, strata and homes
InspectionFree, usually within a few days

Some North Bondi streets sit within heritage conservation areas, so visible changes may need council approval.

Remedial services in North Bondi

One builder for the whole problem.

Leaking balconies cause concrete cancer, failed render lets water into walls. We fix the cause and the damage, so you deal with one licensed builder.

Why METCON

Strata remedial work, done once.

We work to your engineer's or consultant's specification, photograph every hold point and hand over the records your strata committee, insurer and future buyers will ask for. For Class 2 buildings we handle the DBP Act requirements with your design practitioner.

You deal directly with the builder, from the first inspection in North Bondi to the final flood test and handover.

Principal Contractor
Meteora Constructions Pty Ltd
Builder Licence384697C
DBP RegistrationBUP4254812
Demolition LicenceAD214430
Public Liability$20M
ServicingNorth Bondi and Eastern Suburbs
ABN 89 151 074 421
What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from strata buildings and homeowners.

I couldn't be more pleased that I found Constatine and his team to assist our strata building with landscaping, waterproofing, and concrete cancer repairs. He was knowledgeable, reliable, patient, and deeply committed to achieving the best result for everyone involved. I am 100% confident that the work completed will stand the test of time. He will absolutely be my go-to moving forward, and I have no doubt we will work together again.
JJodi Cremorne
Constatine and his team did an excellent job repairing and waterproofing our garage ceiling and walls, which had been affected by concrete cancer and sandstone erosion. Constatine is highly experienced in remedial works and provided clear advice, transparent costings, and recommended the best products available to ensure a long-lasting result. We highly recommend METCON for specialist remedial works.
JJames Cremorne
My partner and I own an original 1920s semi-detached home in Vaucluse, with complex sandstone foundations and multiple structural challenges caused by previous defective works. After years of delays, failed consultants, and no progress, I met Constatine and his team. From the beginning, I was impressed by the detailed review of our plans and the identification of numerous discrepancies that previous builders had missed. The team supported us through lengthy council negotiations, neighbour consultations, and COVID-related delays, even before contracts were signed. Once construction commenced, Constatine and the Meteora Constructions team were exceptional. Progress remained on schedule despite heavy rain, unforeseen structural issues, and highly complex underpinning works that previous builders had refused to undertake. They completed the work efficiently and at significantly less cost than other builders had quoted. I cannot speak highly enough of Constatine and METCON Remedial Services. It is no understatement to say that engaging Constatine and his team saved not only our project, but probably our marriage as well.
SBSteven Brown Vaucluse
Helpful guides

Know more before you start.

Plain-language guides for owners and strata committees.

North Bondi FAQ

Remedial building in North Bondi: questions.

Straight answers from the builder. Anything else, just call.

Retaining Walls in North Bondi
Why does my North Bondi balcony door leak only in storms?

Wind-driven rain on exposed elevations pushes water past worn seals and blocked sill drainage, and over thresholds where the balcony has no set-down. Testing the door and balcony separately shows which one is at fault.

Do you do balcony repairs and waterproofing in North Bondi?

Yes. We repair and re-waterproof balconies, terraces, podiums and wet areas on North Bondi apartment buildings and homes, and repair concrete cancer and balustrades at the same time where needed.

Are you registered for Class 2 apartment work in North Bondi?

Yes. METCON is a licensed builder (384697C) and a registered building practitioner under the Design and Building Practitioners Act (BUP4254812), so we can carry out remedial work on Class 2 apartment buildings.

Do remedial works in North Bondi need council approval?

Many repairs are maintenance and do not, but some works can. Some North Bondi streets sit within heritage conservation areas, so visible changes may need council approval. The council is Waverley Council. We check what applies before quoting.

How much do remedial repairs cost in North Bondi?

It depends on what is under the tiles or render, access and the size of the job. We inspect, test where needed and give an itemised quote, with rates for anything hidden.

Nearby areas

Also servicing near North Bondi.

We work right across Eastern Suburbs and the rest of Sydney. See all service areas.

Leaking balcony or concrete cancer in North Bondi?

Free inspection and a straight answer from a licensed, DBP registered Sydney builder.

Call now Free Quote