Fire Door Defects in NSW Apartment Buildings

19 November 2026 · 4 min read · By the METCON team

Fire doors to apartments, stairs and service cupboards hold back fire and smoke so people can get out. In NSW apartment buildings they are one of the most common items raised when the annual fire safety statement is prepared. Many defects are small. Some mean the door, frame or wall around it has to be replaced.

The annual fire safety statement

Buildings with essential fire safety measures need an annual fire safety statement (AFSS), confirming each measure has been assessed and is performing. Fire doors are one of those measures. If an assessor finds defects, the owners corporation needs to get them fixed so the statement can be issued.

Common fire door defects

  • Doors that do not self-close and latch.
  • Gaps around the door larger than allowed.
  • Missing, damaged or painted-over compliance tags.
  • Non-compliant hardware added by owners, such as extra locks, peepholes or cat flaps.
  • Damaged door leaves or frames.
  • Gaps between the frame and the wall that are not properly fire sealed.
  • Penetrations in the fire-rated wall near the door. See fire stopping defects.

Who fixes what

Fire doorsets must be installed and certified by people accredited for that work. Many repairs, like adjusting closers, are routine. Where the door, frame or surrounding wall needs replacing, building work is usually involved too: removing and reinstating walls, frames, linings and finishes. We carry out that building work and coordinate the accredited fire door installer.

Fire doors in apartment entries

Unit entry doors are often fire doors even though they belong to the lot or sit on a boundary. By-laws and the strata plan decide responsibility, but the fire safety outcome is the same. Owners should not replace them with ordinary doors.

Defects in newer buildings

If the building is recent, fire door and fire stopping defects may be building defects. A fire safety system is a major element under the Home Building Act, which matters for warranty claims. See the major defect test and defect reports before warranties expire.

Fire door and fire safety rectification

We carry out fire safety rectification building work in occupied apartment buildings. See defect rectification and Class 2 building work. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.

Frequently asked questions

Can an owner replace their fire-rated entry door?

Only with a compliant fire doorset installed and certified by an accredited installer, and with any approval the by-laws require.

Are fire door gaps really a problem?

Yes. Gaps let smoke and fire through. Allowed gaps are small, so worn doors and frames often fail inspection.

Who pays for fire door defects?

Usually the owners corporation for common property doors. If the defect is a building defect in a newer building, a warranty claim may be possible.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote