Remedial building for Zetland apartment buildings and strata schemes: balcony and podium waterproofing, basement leaks, planter box repairs and defect rectification.
Zetland is part of the Green Square area, mostly made up of apartment buildings constructed since the early 2000s on former industrial land. The earliest buildings are now old enough for their membranes, sealants and coatings to need attention.
Landscaped podiums, communal gardens and deep basements are common here, and the area is relatively low-lying. Keeping groundwater and stormwater out of basements and keeping podium drains working are important for these buildings.

Most Zetland apartment buildings are modern and not heritage listed. Council approval may still be needed for some external works.
Leaking balconies cause concrete cancer, failed render lets water into walls. We fix the cause and the damage, so you deal with one licensed builder.
We work to your engineer's or consultant's specification, photograph every hold point and hand over the records your strata committee, insurer and future buyers will ask for. For Class 2 buildings we handle the DBP Act requirements with your design practitioner.
You deal directly with the builder, from the first inspection in Zetland to the final flood test and handover.
Real reviews from strata buildings and homeowners.
I couldn't be more pleased that I found Constatine and his team to assist our strata building with landscaping, waterproofing, and concrete cancer repairs. He was knowledgeable, reliable, patient, and deeply committed to achieving the best result for everyone involved. I am 100% confident that the work completed will stand the test of time. He will absolutely be my go-to moving forward, and I have no doubt we will work together again.
Constatine and his team did an excellent job repairing and waterproofing our garage ceiling and walls, which had been affected by concrete cancer and sandstone erosion. Constatine is highly experienced in remedial works and provided clear advice, transparent costings, and recommended the best products available to ensure a long-lasting result. We highly recommend METCON for specialist remedial works.
My partner and I own an original 1920s semi-detached home in Vaucluse, with complex sandstone foundations and multiple structural challenges caused by previous defective works. After years of delays, failed consultants, and no progress, I met Constatine and his team. From the beginning, I was impressed by the detailed review of our plans and the identification of numerous discrepancies that previous builders had missed. The team supported us through lengthy council negotiations, neighbour consultations, and COVID-related delays, even before contracts were signed. Once construction commenced, Constatine and the Meteora Constructions team were exceptional. Progress remained on schedule despite heavy rain, unforeseen structural issues, and highly complex underpinning works that previous builders had refused to undertake. They completed the work efficiently and at significantly less cost than other builders had quoted. I cannot speak highly enough of Constatine and METCON Remedial Services. It is no understatement to say that engaging Constatine and his team saved not only our project, but probably our marriage as well.
Plain-language guides for owners and strata committees.
Straight answers from the builder. Anything else, just call.
Common causes are leaking podiums and planters above, cracks or joints in the basement walls and blocked drainage. We trace the source first, then recommend repairs such as crack injection, drainage or re-waterproofing.
Yes. We repair and re-waterproof balconies, terraces, podiums and wet areas on Zetland apartment buildings and homes, and repair concrete cancer and balustrades at the same time where needed.
Yes. METCON is a licensed builder (384697C) and a registered building practitioner under the Design and Building Practitioners Act (BUP4254812), so we can carry out remedial work on Class 2 apartment buildings.
Many repairs are maintenance and do not, but some works can. Most Zetland apartment buildings are modern and not heritage listed. Council approval may still be needed for some external works. The council is City of Sydney. We check what applies before quoting.
It depends on what is under the tiles or render, access and the size of the job. We inspect, test where needed and give an itemised quote, with rates for anything hidden.
We work right across City Fringe and the rest of Sydney. See all service areas.
Free inspection and a straight answer from a licensed, DBP registered Sydney builder.