A large share of Sydney's apartments were built in the 1990s and 2000s. Many are now 20 to 30 years old, and they are showing a familiar set of problems. Knowing what to expect helps committees plan before small issues become big ones.
Balcony waterproofing
Original membranes under balcony tiles are reaching the end of their life. Common details from the era, such as low upturns at doors and minimal falls, make leaks more likely. See how long balcony waterproofing lasts.
Sealants and expansion joints
Window perimeter sealants and facade joints were never designed to last this long. Failed sealant is a major source of water ingress. See window sealant replacement.
Aluminium windows and sliding doors
Worn seals, failed drainage in sliding door tracks and corroded fixings cause leaks and draughts. Some buildings face window replacement. See window replacement.
Podiums and planters
Landscaped podiums and planter boxes over car parks leak as membranes age and roots find their way through. See podium waterproofing.
Car parks
Water leaks through podiums and expansion joints, and early concrete cancer appears where cover is low. See expansion joint repairs.
Painted render facades
Cracking render, drummy patches and coatings at the end of their life. Repainting needs repairs first. See what to fix before repainting.
Fire safety items
Fire doors, fire stopping and essential services that have been modified by owners over the years. See fire doors.
Plan ahead
A building condition survey at 20 years, priced and turned into a capital works plan, avoids emergency levies. See prioritising repairs.
Remedial works for buildings of this era
We repair and renew 1990s and 2000s apartment buildings across Sydney. See strata remedial works. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.
Frequently asked questions
Are these problems building defects?
Usually not at this age. Warranty periods have long passed, so these are maintenance and renewal items for the owners corporation.
What should we fix first?
Safety items, then anything letting water in. Water causes most of the damage.
How often should balconies be checked?
A visual check every year and a closer inspection every few years, especially as membranes age.