Podium and Roof Terrace Waterproofing for Apartment Buildings

2 November 2026 · 4 min read · By the METCON team

Many Sydney apartment buildings have podium decks, communal courtyards, roof terraces or landscaped areas built over car parks, lobbies, shops or units. These are some of the hardest areas to waterproof, and some of the most expensive to fix when they fail.

Signs your podium or roof terrace is leaking

  • Drips, stains and calcium stalactites on the car park ceiling.
  • Rust staining and spalling concrete on the slab underside. See car park concrete repairs.
  • Water through expansion joints.
  • Damp or mould in lobbies, storerooms or units below.
  • Ponding water on the terrace or paving.
  • Dead or struggling plants in planters that are too wet.
Spalled concrete on a slab soffit below a leaking deck.
Spalled concrete on a slab soffit below a leaking deck.

Why podiums and roof terraces leak

  • Membrane damage during construction or later works, such as landscaping, plumbing or new fixings.
  • Poor detailing at upturns, penetrations, drains, door thresholds and expansion joints.
  • Drainage failures: blocked outlets, no drainage layer, or water trapped above the membrane.
  • Root damage from planters without a root barrier.
  • Movement at joints and cracks in the slab.
  • Age: membranes have a service life, and older buildings are often on their original system.

Finding the leak

Because the membrane is buried under paving, soil or screed, the leak point on the ceiling below is often a long way from where water gets in. Methods include:

  • Mapping leaks on the soffit below against the layout above.
  • Flood testing sections of the deck.
  • Electronic leak detection, which can locate holes in some membrane systems without removing everything.
  • Opening up test areas to inspect the membrane and drainage.

Repair options

Local repairs

Where the leak is traced to one drain, penetration, joint or planter, that area can be opened up and repaired.

Joint repairs

Failed expansion joints can be replaced with new joint systems designed for the movement.

Injection from below

Crack and joint injection from the soffit can stop some leaks where access from above is difficult. It treats the symptom, so it works best for small, well-defined cracks.

Full re-waterproofing

Removing paving, soil and screed, repairing the slab, then installing a new membrane system with protection board, drainage layer, root barrier where needed, and correct details at every upturn, drain and joint. This is usually staged so residents keep access.

Membrane systems for podiums

Options include hot-applied and torch-on bituminous membranes, liquid-applied polyurethane and hybrid membranes, and sheet membranes, chosen by an engineer or consultant to suit traffic, landscaping and the finish above. See waterproofing membrane types.

Planning a podium project in strata

  • Start with a consultant scope and testing, so the right areas are opened.
  • Plan staging, access for residents and protection of the car park.
  • Allow for landscaping removal and reinstatement.
  • Budget through the capital works fund and plan levies early. See special levies for remedial works.

Podium and roof waterproofing in Sydney

We repair and re-waterproof podiums, roof terraces, courtyards and planters on apartment and commercial buildings, working to the engineer's or consultant's specification. See also flat roof waterproofing. See our waterproofing service or call 0415 840 500.

Frequently asked questions

Why is my apartment car park leaking?

Usually because the podium, courtyard or terrace waterproofing above has failed at a drain, joint, upturn, planter or penetration, or reached the end of its life.

How do you find a leak in a podium deck?

By mapping leaks below, flood testing sections, electronic leak detection on suitable membranes, and opening up test areas.

Can a podium be waterproofed from underneath?

Some cracks and joints can be injected from below, but a failed membrane usually needs to be repaired or replaced from above.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Structural Remediation
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles