Waterproofing Membranes: Types, Uses and How to Choose

28 October 2026 · 4 min read · By the METCON team

There is no single best waterproofing membrane. The right one depends on where it goes, what goes on top of it, how much movement it must take and whether it will be exposed to sun or water pressure.

Liquid-applied membranes

Polyurethane

Flexible and widely used for balconies, roofs and wet areas. Good elongation to handle movement. Some types need protection from UV.

Acrylic (water-based)

Easy to apply and common in bathrooms and under tiles. Usually needs to be covered, and needs good drying conditions to cure.

Cementitious

Cement-based coatings suited to basements, water tanks and areas with water pressure from behind. Less flexible, so not ideal where there is movement.

Sheet membranes

Torch-on bitumen

Bitumen sheets heat-welded in place. Common on roofs, podiums and planter boxes. Durable, but needs careful detailing at joints and edges.

Synthetic sheets

PVC, TPO and EPDM sheets for exposed roofs and large areas, with welded or bonded seams.

Flexibility classes

Australian Standard AS 4858 classifies membranes by how much they can stretch, from low to high extensibility. Areas with more movement, such as balconies and timber floors, need more flexible membranes.

Choosing the right membrane

AreaCommon choices
Bathrooms and wet areasAcrylic or polyurethane liquid membranes
Tiled balconiesFlexible liquid membranes under tiles
Exposed roofsTorch-on, synthetic sheet or UV-stable liquid
Planter boxesTorch-on or root-resistant systems
BasementsCementitious, crystalline or sheet systems

Details matter more than the product

Most membrane failures happen at the details: upturns, corners, drains, penetrations and edges. Falls, bond breakers, puddle flanges and correct thickness decide whether any membrane works. See balcony waterproofing standards.

Remedial waterproofing

See our waterproofing service or call 0415 840 500.

Frequently asked questions

What is the best waterproofing membrane?

It depends on the area. Flexible liquid membranes suit balconies and bathrooms; torch-on and sheet membranes suit roofs and planters; cementitious systems suit basements.

What is AS 4858?

The Australian Standard that covers wet area membranes, including classifying them by how much they can stretch.

Why do waterproofing membranes fail?

Usually at the details: corners, upturns, drains, penetrations and edges, or because the membrane did not suit the movement or exposure.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Structural Remediation
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote