Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Strata

Prioritising Strata Repairs From a Condition Report

20 November 2026 · 4 min read · By the METCON team

A building condition report or capital works review often lists dozens of items. Committees can feel overwhelmed, or spend on easy cosmetic items while serious ones wait. A simple priority system turns the list into a plan.

Priority 1: Safety

  • Loose or falling concrete, render or tiles.
  • Loose balustrades and handrails.
  • Trip hazards on paths and stairs.
  • Fire safety defects, such as fire doors and fire stopping.

Make safe immediately, then repair. See falling concrete and render.

Structural items like corroded reinforcement get worse every year they wait.
Structural items like corroded reinforcement get worse every year they wait.

Priority 2: Water getting in

Leaks cause most of the damage in apartment buildings. Failed balcony membranes, roof leaks, failed sealants and blocked drainage get worse, and spread damage, every year. See the cost of delaying repairs.

Priority 3: Structure

Concrete cancer, corroded wall ties and lintels, and structural cracking. Repair costs grow quickly as corrosion spreads. See signs of concrete cancer.

Priority 4: Planned renewal

Painting, roof renewal, lift and services upgrades, and finishes. Plan these in the capital works fund, and time them to share access with other works.

Priority 5: Cosmetic

Lobby finishes, landscaping and appearance items. Worth doing, but after the building is safe and dry.

Turn it into a program

TimingWhat goes in
NowMake safe items
This yearLeaks and urgent structural repairs
1 to 3 yearsRemaining structural items, combined access works
3 to 10 yearsPlanned renewal in the capital works fund

Group work to save on access

Scaffold and swing stages are expensive. Group facade, balcony and window work by elevation so access is set up once. See building-wide repair programs.

Help with priorities

We review condition reports with committees, price the priorities and plan staged works. See strata remedial works. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.

Frequently asked questions

Do we have to fix everything in the report?

The duty to repair applies to common property, but timing and method are decisions for the owners corporation. Safety and water items should not wait.

Can we stage the works over several years?

Yes, and it is common. Staging by elevation or block keeps access costs down.

How often should a condition report be updated?

Many schemes review it alongside the 10 year capital works fund plan, with interim checks after major repairs.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote