If you own in a newer apartment building in NSW, you may hear about the strata building bond. It is a safety net designed to get defects fixed in the first couple of years after completion.
What the scheme is
Under the Strata Building Bond and Inspections Scheme, the developer of a new residential strata building lodges a bond with NSW Fair Trading, generally 2% of the contract price for the building work. The bond can be used to pay for rectifying defects identified in the scheme's inspection reports. Check NSW Fair Trading for which buildings the scheme currently applies to.
The inspections
- Interim inspection: an independent inspector inspects the building, usually 15 to 18 months after completion, and prepares an interim report listing defects.
- Rectification period: the developer and builder have the opportunity to fix the defects.
- Final inspection: usually 21 to 24 months after completion, the inspector reports on whether defects have been fixed.
What happens to the bond
If defects in the final report have not been fixed, the bond can be paid to the owners corporation to cover the cost of rectification. If all defects are fixed, the bond is returned to the developer.
What owners corporations should do
- Make sure the owners corporation is involved in the inspector's appointment and the inspections.
- Collect residents' reports of leaks, cracks and defects early, so they are included.
- Read the interim report carefully and track every defect.
- Get independent advice if the bond may not cover the full cost of repairs.
The bond is not the only protection
Owners corporations also have statutory warranties under the Home Building Act 1989, and duty of care rights under the Design and Building Practitioners Act 2020. Bond timeframes are short, so do not wait to act on defects.
Getting defects fixed
If the bond is paid out, the owners corporation needs a builder to carry out the rectification. METCON is DBP registered for Class 2 work and prices defect reports line by line. See our defect rectification service or read what to do with a defect report.
Frequently asked questions
How much is the strata building bond in NSW?
Generally 2% of the contract price for the building work, lodged with NSW Fair Trading by the developer.
When are strata bond inspections done?
An interim inspection usually 15 to 18 months after completion, and a final inspection usually 21 to 24 months after completion.
What if the bond does not cover all the defects?
Owners corporations may still have rights under statutory warranties and the Design and Building Practitioners Act. Get advice early.