Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Compliance

Avoiding Waterproofing Defects: A Developer's Guide

9 November 2026 · 4 min read · By the METCON team

Waterproofing is one of the most common serious defects in new apartment buildings, and one of the costliest to fix once tiles and landscaping are in. Most failures come from a few repeated details. Developers who focus on these can avoid a lot of pain later.

The details that fail most often

1. Door thresholds

Level or near-level thresholds between apartments and balconies need careful setdowns, drainage and upstands. See balcony thresholds.

2. Falls and drainage

Flat or back-falling balconies leave water sitting on membranes. Outlets must be set correctly, with overflows. See pooling water.

3. Penetrations

Balustrade posts, pipes and fixings through membranes need proper sealing details.

4. Planters and podiums

Root barriers, drainage cells, protection boards and outlets must all work together. See planter boxes and podiums.

5. Membrane terminations

Upstands too low, or not protected under flashings and cladding.

6. Wet areas

Shower hobs, hobless showers and floor wastes. See bathroom waterproofing.

Waterproofing works in progress.
Waterproofing works in progress.

How to prevent defects

  1. Design: detailed waterproofing drawings, not just notes. Under the DBP Act, regulated designs and declarations may be required.
  2. Products: compatible systems, used to the manufacturer's instructions.
  3. Licensed installers: with experience in the relevant system.
  4. Hold points: inspections before membranes are covered.
  5. Flood testing: where suitable, before tiling.
  6. Records: photos and certificates for every area. See waterproofing certificates.

The cost of getting it wrong

Rectifying a failed balcony usually means removing tiles, screeds and sometimes balustrades, in an occupied building. Defects can lead to orders, claims and reputational damage. See RAB Act orders and waterproofing defects in new apartments.

How it helps developers

Getting waterproofing right protects settlements, reduces warranty claims and gives buyers confidence in your next project.

Waterproofing reviews and rectification

We can review details, inspect works and rectify waterproofing defects on Class 2 buildings. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.

Frequently asked questions

What causes most waterproofing defects in new apartments?

Common causes are door thresholds, poor falls and drainage, unsealed penetrations, planter and podium details and low upstands.

Should every balcony be flood tested?

Flood testing is a useful check before tiling where suitable. Requirements depend on the project and specification.

Does the DBP Act cover waterproofing?

Yes. Waterproofing is one of the building elements covered, so regulated designs and declarations may be required for Class 2 buildings.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Council Approvals
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote