Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Compliance

Balcony Balustrade Height Rules in NSW and Australia

30 October 2026 · 4 min read · By the METCON team

Balustrades stop people, especially children, falling from balconies, decks, stairs and landings. The National Construction Code sets the rules, and many older Sydney balconies were built before the current requirements.

When a balustrade is required

Under the National Construction Code, a barrier is generally required where a floor, balcony, deck, landing or stair is more than 1 metre above the surface below.

Minimum height

  • Balconies, decks and landings: at least 1 metre above the floor.
  • Stairs: generally at least 865mm above the line of the stair nosings.

Openings

Gaps in a balustrade must not allow a 125mm sphere to pass through, so a small child cannot slip through.

Climbable elements

Where a floor is more than 4 metres above the surface below, the balustrade must not have horizontal or near-horizontal elements that could be climbed between 150mm and 760mm above the floor. Horizontal wires and rails on high balconies are a common non-compliance.

Glass balustrades

Glass balustrades must use the right safety glass and fixings, designed for the loads in the Australian Standards. Loose clamps, missing caps and cracked panels need prompt attention.

Older balconies

Existing balustrades built to earlier rules are not automatically illegal, but owners have a duty to keep them safe. Corroded posts, loose fixings, rotten timber and low or climbable balustrades are worth upgrading, especially in strata buildings where many people use them.

Signs a balustrade needs attention

  • Movement when pushed.
  • Rust at the base of posts or fixings.
  • Cracked concrete around post fixings.
  • Gaps wider than 125mm.
  • Horizontal rails on high balconies.

Balcony and balustrade repairs

We replace and upgrade balustrades as part of balcony remediation, sealing new fixings into the waterproofing. See our balcony repair service or call 0415 840 500.

Frequently asked questions

How high must a balcony balustrade be in NSW?

Generally at least 1 metre above the floor where the balcony is more than 1 metre above the ground or surface below.

What is the maximum gap in a balustrade?

Openings must not allow a 125mm sphere to pass through.

Are horizontal balustrade wires allowed?

Not on floors more than 4 metres above the surface below, where climbable elements between 150mm and 760mm are not permitted.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Council Approvals
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote