Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Remedial

Balcony Planter Boxes Leaking Into Apartments

10 November 2026 · 4 min read · By the METCON team

Built-in planter boxes look great on apartment balconies, but they keep wet soil and roots against the structure all year. When the waterproofing inside fails, water leaks into walls, ceilings and apartments below.

Signs of a leaking planter

  • Stains, drips or white deposits under or beside the planter.
  • Damp walls inside next to the planter.
  • Cracks in the planter walls or render.
  • Water draining slowly from the planter.
Waterproofing applied to an internal surface.
Waterproofing applied to an internal surface.

Why planters leak

  • Membranes damaged by roots, tools or age.
  • No protection board over the membrane.
  • Blocked drains, so water sits in the soil.
  • Poor detail where the planter meets walls or the slab.

Repair options

  1. Empty the planter of soil and plants.
  2. Remove old membrane and repair concrete.
  3. Install a new membrane suitable for planters, with root protection.
  4. Add drainage cell, filter fabric and a working outlet.
  5. Flood test, then replant. See flood testing.

See planter box waterproofing.

Or remove it

Some owners corporations decide to remove problem planters or replace them with freestanding pots on a waterproofed floor. That needs approval, and may need waterproofing changes where the planter was.

Look after it

  • Keep outlets clear.
  • Avoid plants with aggressive roots.
  • Don't overwater.

How fixing it helps

A sound planter keeps the garden without damaging the building or neighbours.

Planter repairs

We re-waterproof planters on balconies, podiums and roof terraces. Call 0415 840 500 or book a free inspection.

Frequently asked questions

Why is my balcony planter leaking?

Usually the membrane inside has failed or the drain is blocked, so water soaks through the planter walls.

Can a planter box be waterproofed without removing the plants?

Generally no. The soil needs to come out so the membrane can be replaced and tested.

Should we remove built-in planters?

Sometimes it is simpler. Freestanding pots on a sound membrane can be an option, with approval.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Structural Remediation
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote