In larger NCAT building disputes, the Tribunal often directs the experts for each side to meet, try to agree and write a joint report. Done well, this narrows the dispute and shortens the hearing.

What is a conclave?

NCAT's home building guideline describes a conclave as an on-site meeting between the experts and a Tribunal Member to discuss the issues covered in their reports. The purpose is to narrow the differences between the experts, to help settle the dispute or at least shorten the hearing.

What experts must do

Under Procedural Direction 3, an expert must follow directions to:

  • Attend a conclave or conference with other experts.
  • Try to reach agreement on the issues.
  • Prepare a joint report setting out what is agreed, what is not and why.
  • Base the joint report on specified facts or assumptions where directed.
  • Give evidence concurrently with other experts.

Experts must use their own independent judgment and must not follow any instruction to withhold or avoid agreement.

What happens on the day

  1. The experts walk the site, item by item, usually working from the Scott Schedule.
  2. For each item they discuss whether it is a defect, the fix and the cost.
  3. Agreed items are recorded. Disputed items are narrowed to the real point of difference.
  4. A joint report follows.

How to prepare

  • Make sure your expert's report is clear, itemised and costed.
  • Use a consistent numbering system across every document. See Scott Schedules.
  • Give the expert access to the whole site, including areas opened up for inspection.
  • Do not pressure your expert to hold out. It breaches the code and usually backfires.

Why it helps everyone

Most items in a building dispute can be agreed by two competent experts on site. What is left goes to hearing, which saves time and legal costs. Clear, honest costings are a big part of that. See builder's quotes for NCAT.

Experts who build

We attend conclaves and prepare joint reports as builders who know what each fix really involves. See NCAT expert reports. METCON is a licensed builder (384697C) and DBP registered (BUP4254812), and we fix building defects for a living. Call 0415 840 500 or request a report or quote. We confirm a fixed fee before we start.

This article is general information, not legal advice. For your situation, speak to a lawyer, NSW Fair Trading or the Tribunal.

Frequently asked questions

Can I attend the conclave?

Usually the parties do not take part in the experts' discussion, though arrangements depend on the Tribunal's directions. Check with the Tribunal or your lawyer.

What if the experts cannot agree?

The joint report records the disagreement and reasons, and the member decides those items at the hearing, often after hearing the experts together.

Is the joint report binding?

It is evidence, not a decision, but agreed items are rarely argued again at the hearing.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Inspections & Reports
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Need a report for NCAT, court or insurance?

Fixed fee agreed before we start. Clear findings, an itemised scope and a fixed-price rectification quote.

Call now Request Report