After months of letters, Fair Trading and directions, the hearing date arrives. Knowing what happens on the day takes away a lot of the stress and helps you present your evidence well.
Before the day
- Check that every document you rely on was filed and served by the dates the Tribunal set.
- Read the other side's evidence, especially their expert report.
- Make sure your expert knows the date and time and is available.
- Prepare a short summary of what you are asking for: a work order or money order, and the amount.
- Bring copies of key documents, tabbed.
On the day
Hearings are less formal than court, but still a legal process. The member introduces the matter, confirms what is in dispute and the evidence filed, and sets out how the hearing will run. You may be asked to give evidence and answer questions. The other side does the same.
How expert evidence is heard
Experts often give evidence together, a method sometimes called concurrent evidence or "hot tubbing". The member asks each expert about each disputed item, and the experts can respond to each other. This is where a well-prepared, honest expert stands out. If there was a conclave, the joint report narrows the items to argue.
Working through the defects
Many members work through the Scott Schedule item by item: is it defective, what is the fix, what does it cost. Clear, itemised evidence makes this fast and makes it easy for the member to allow your items.
Tips for owners
- Be calm and brief. Answer the question asked.
- Leave technical questions to your expert.
- Do not argue about items your own expert accepted are not defects.
- Focus on the big items.
After the hearing
The member may decide on the day or reserve the decision and give written reasons later. Orders may require the builder to fix the work within a time, or pay an amount. If a work order is not complied with, you can usually go back to the Tribunal.
Expert evidence that holds up
We prepare NCAT expert reports written to Procedural Direction 3, with fixed-price itemised costs, and attend conclaves and hearings as directed. The fee is fixed and agreed in writing before the inspection, so you know the cost of the report before you commit. METCON is a licensed builder (384697C) and DBP registered (BUP4254812), and we fix building defects for a living. Call 0415 840 500 or request a report or quote. We confirm a fixed fee in writing before we start.
This article is general information, not legal advice. For your situation, speak to a lawyer, NSW Fair Trading or the Tribunal.
Frequently asked questions
Does my expert have to attend the hearing?
If the Tribunal directs it, or if the other side wants to ask questions, yes. Check the directions and confirm availability early.
Can I bring new evidence on the day?
Usually not without the Tribunal's permission. Evidence should be filed by the dates set in the directions.
Can I appeal an NCAT decision?
Internal appeals are possible in some circumstances, within strict time limits. Get legal advice promptly.