Most Sydney brick homes and many apartment blocks have cavity walls: an outer skin of brick, a gap, and an inner skin of brick or a frame. Metal wall ties hold the two together. When those ties corrode, the outer wall can crack, bulge and eventually become unsafe.
Why wall ties corrode
- Older ties had thin galvanising that wears away over decades.
- Coastal salt air speeds corrosion.
- Water getting into the cavity through cracks, failed flashings or blocked weep holes.
Signs of wall tie failure
- Horizontal cracks in mortar joints, often every few courses.
- Bulging or bowing brickwork.
- Lifting of the outer wall as rusting ties expand in the mortar joints.
- Cracks around windows and at corners.
- Loose bricks or a wall that moves when pushed.
How wall ties are checked
A small number of bricks are removed, or a borescope is used through a drilled hole, to inspect the ties inside the cavity.
Retrofit wall tie replacement
- Install new ties: stainless steel helical or mechanical ties are drilled through the outer skin into the inner wall, usually without removing bricks.
- Isolate or remove old ties where their rust is cracking the brickwork.
- Repair cracks with crack stitching and repointing. See crack stitching.
- Rebuild sections that have bulged too far to save.
Fix the water too
Clear weep holes, repair flashings and seal cracks so the new ties stay dry.
Wall tie replacement in Sydney
See our brickwork repair service or send us photos of the cracking.
Frequently asked questions
What are the signs of wall tie failure?
Horizontal cracks in mortar joints, bulging or lifting brickwork, cracks around openings and loose bricks.
Can wall ties be replaced without rebuilding the wall?
Usually. Retrofit stainless steel ties are drilled in from outside, with only badly damaged sections rebuilt.
Are corroded wall ties dangerous?
They can be, because the outer brick skin can lose its connection to the structure and become unstable.


