Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Strata

Facade Cleaning and Sealing for Apartment Buildings

20 November 2026 · 4 min read · By the METCON team

Over time, facades collect dirt, pollution, mould, salt and efflorescence. Cleaning can transform a building. Done badly, it damages brick faces, washes out mortar and drives water into walls. The method has to suit the material.

Cleaning methods

MethodSuitsRisk
Low pressure water and soft brushingMost surfacesSlow on heavy soiling
Chemical cleanersSpecific stains, efflorescence, mouldWrong chemical can stain or etch
Steam cleaningHeritage brick and stoneSlower, specialist equipment
High pressure waterHard concrete only, with careErodes brick faces and mortar, forces water in

Always test a small, out-of-sight area first. See sandstone cleaning methods.

Repair before sealing

Sealers will not fix cracks, open joints or failed flashings. Repair first:

  • Repoint eroded mortar joints.
  • Repair cracks and spalled concrete.
  • Replace failed sealants around windows.
  • Clear weep holes.

Should you seal at all?

Penetrating water repellents can reduce water absorption into brick, stone and concrete while letting the wall breathe. Film-forming coatings trap moisture in masonry and can cause spalling. Choose a breathable product suited to the material, and ask about the expected life. See elastomeric coatings.

Efflorescence

White salt deposits mean water is moving through the wall. Cleaning removes them, but they return until the water source is fixed. See efflorescence.

Facade cleaning and repairs

We clean, repair and protect facades on occupied apartment buildings. See facade repairs. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.

Frequently asked questions

Can we pressure wash our brick building?

High pressure can strip the brick face and wash out mortar. Low pressure methods are safer for brick.

How long does a sealer last?

It depends on the product and exposure. Ask for the manufacturer's expected life and recoat interval.

Does facade cleaning need approval?

Usually not for cleaning alone, but heritage buildings may have conditions. Check if the building is heritage listed.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote