When a strata building is repainted, the committee is often offered an elastomeric coating: a thick, flexible paint system that bridges fine cracks and sheds water. On the right building it is a good choice. On the wrong one it hides problems and traps moisture.
What elastomeric coatings do
- Stretch and recover, so they bridge fine cracks that move a little.
- Build a thicker film than ordinary paint.
- Shed rain and reduce water getting into fine cracks in render.

Where they work well
- Rendered or concrete facades with fine shrinkage cracking.
- Walls that are sound and dry before coating.
- After cracks, spalling and failed sealants have been properly repaired.
Where they can cause trouble
- Walls that are already wet: rising damp or leaks behind the coating cannot dry out, and the coating blisters.
- Structural cracking: a coating will not hold a wall together. The cause must be fixed first.
- Concrete cancer: coating over rusting reinforcement hides the problem while it gets worse.
- Some heritage masonry: older lime-based walls need to breathe.
Preparation decides the result
- Inspect the whole facade, ideally from a swing stage or scaffold, and tap test the render.
- Repair drummy render, cracks and concrete cancer. See drummy render.
- Replace failed sealants and flashings.
- Clean and prime to the manufacturer's system.
- Apply at the right film thickness, checked during application.
Repainting with repairs
A repaint is the best time to fix the facade, because access is already up. See what to fix before repainting.
Facade repairs and coatings
We repair facades and apply coating systems on occupied apartment buildings. See facade repairs. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.
Frequently asked questions
Does an elastomeric coating waterproof a wall?
It reduces water entry through fine cracks, but it is not a substitute for proper flashings, sealants and waterproofing at balconies and windows.
How long do elastomeric coatings last?
It depends on the product, exposure and preparation. Ask for the manufacturer's system warranty and maintenance requirements.
Can it go over existing paint?
Often yes, if the existing paint is well bonded. Test patches confirm adhesion before the full job.