Many Sydney apartment blocks from the 1950s to the 1980s have concrete hoods over windows, sunshade fins, thin concrete sills and entry awnings. They look simple, but they are some of the most vulnerable concrete on the building.
Why they fail first
- They are thin, so the steel often sits very close to the surface.
- Rain, salt and sun hit them from three or four sides.
- Water sits on flat tops with no falls or drip grooves.
- They are hard to inspect without scaffold or a lift.
Warning signs
- Rust stains running down from the edge or underside.
- Cracks along the line of the front edge.
- Bulging or flaking paint and render on the underside.
- Pieces of concrete on the ground or window ledges below.
Falling concrete from above a window or entry is a safety risk to people below. If pieces are falling, cordon off the area and get the loose material removed promptly. See falling concrete and render.
Repair options
- Patch repair. Cut back, treat the steel and rebuild with repair mortar, then coat. Suits localised damage.
- Recasting. Where the steel is badly corroded or the cover is too thin, the engineer may specify breaking out and recasting the element with proper cover.
- Removal. Some purely decorative hoods can be removed altogether if the engineer, council and owners agree. Heritage controls may apply.
Protect them afterwards
Add or restore falls on top, form a drip groove underneath and apply a protective coating. These small details keep water off the steel. See protective coatings and drip grooves.
Facade concrete repairs
We repair window hoods, sills, fins and awnings as part of facade and concrete cancer works, with the access to reach them safely. See facade repairs. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.
Frequently asked questions
Can window hoods be repaired from inside?
Rarely. Most need external access: scaffold, a boom lift, a swing stage or rope access depending on height.
Should all hoods be repaired at once?
It is usually more economical to inspect and repair them all while access is set up, since they are the same age and design.
Are falling pieces dangerous?
Yes. Even small pieces from upper floors can injure someone. Make the area safe straight away.