Enclosing a balcony with glazing or louvres can make an apartment feel bigger and quieter. But it changes the building's appearance and common property, and can create waterproofing, fire and ventilation issues.
This is general information from a builder, not legal advice. Your strata manager or lawyer can advise on your building.
Approvals
- Strata: changes to common property generally need a special resolution and often a by-law setting out maintenance responsibilities.
- Council or certifier: enclosures generally need development approval or a complying development certificate. Check before you buy anything.
- Heritage: extra controls may apply in conservation areas.

Building issues to resolve
- Waterproofing: the balcony is still a wet area if water can get in. Drains, sills and membranes must still work.
- Drainage: blocking drains or overflows can cause leaks.
- Fire safety: enclosure can affect fire separation and spread between floors.
- Ventilation: enclosed spaces can trap moisture and grow mould. See mould in apartments.
- Structure: frames and glazing add load and fixings. See fixings that cause leaks.
- Energy: glazing can affect energy compliance.
Fix the balcony first
If the balcony leaks or has concrete cancer, fix it before enclosing it. Repairs are much harder once frames are installed.
Building-wide approach
Some buildings approve one standard enclosure design for all apartments, which keeps the facade consistent and simplifies approvals.
How doing it properly helps
An approved, properly built enclosure adds value without creating leaks, disputes or problems when you sell.
Balcony works in strata buildings
We repair balconies before enclosure and handle the waterproofing details. Call 0415 840 500 or book a free inspection.
Frequently asked questions
Can I enclose my apartment balcony in NSW?
Possibly, with strata approval and usually council or certifier approval. Check both before starting.
Does an enclosed balcony still need waterproofing?
Yes. Water can still get in, and drains and membranes must keep working.
Who maintains an enclosed balcony?
Usually set out in a by-law approved by the owners corporation.


