Loose and Falling Facade Tiles on Apartment Buildings

9 November 2026 · 4 min read · By the METCON team

Many apartment buildings from the 1960s to the 1980s, and some newer ones, have tiled or mosaic facades. Over time tiles can lose their bond and fall. A single tile falling from height can hurt someone, so loose facade tiles need prompt attention.

Why tiles come loose

  • Old adhesives break down with age, heat and moisture.
  • Building movement without enough movement joints.
  • Water getting behind tiles through cracked grout or joints.
  • Rusting steel behind the tiles pushing them off.
  • Poor original installation.
Scaffold gives safe access to inspect and repair a facade.
Scaffold gives safe access to inspect and repair a facade.

Warning signs

  • Tiles or pieces on the ground.
  • Bulging, cracked or missing tiles.
  • Cracked grout and staining.
  • Hollow sounding tiles when tapped. See drummy tiles.

First steps

  1. Keep people clear below and barricade if needed.
  2. Report it to the strata or building manager.
  3. Arrange an urgent inspection and make-safe. See falling material.

How facades are inspected

Tiles are tap tested to map hollow areas, using rope access, a swing stage or scaffold. See access options.

Repair options

  • Remove loose tiles: an immediate safety step.
  • Re-fix with injection: some systems inject adhesive and use pins or anchors to re-secure tiles in place.
  • Remove and re-tile: for badly affected areas.
  • Movement joints: adding or repairing joints to reduce future stress.
  • Alternative finish: render and coating where re-tiling is impractical.

Matching tiles

Original tiles may no longer be made. Salvaged tiles, close matches or a planned change of finish across an elevation can be considered. Check heritage and council requirements if appearance changes.

How repairs help

Fixing tiles removes a safety hazard, protects the wall behind and keeps the building looking cared for.

Facade tile repairs

We inspect, make safe and repair tiled facades on apartment buildings. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.

Frequently asked questions

Why are tiles falling off our building?

Old adhesives fail, buildings move and water gets behind tiles. Rusting steel behind tiles can also push them off.

Can loose facade tiles be re-fixed?

Sometimes, using injection and anchoring systems. Badly affected areas may need removal and re-tiling.

How are loose facade tiles found?

By tap testing every tile from rope access, a swing stage or scaffold, and mapping the hollow areas.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Structural Remediation
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote