Defective Building Work in NSW: What to Do, Step by Step

18 November 2026 · 4 min read · By the METCON team

Finding defects in new building work is stressful, especially if the builder is not responding. Taking the right steps, in the right order, protects your position.

Step 1: Document everything

  • Dated photos and videos of every defect.
  • A list of when you first noticed each one.
  • Your contract, plans, specifications and variations.
  • Payment records and all correspondence.
Failed render documented as part of a defect report.
Failed render documented as part of a defect report.

Step 2: Get a defect report

A professional defect report sets out each item, why it is defective and what it will cost to fix. Builders take a report far more seriously than a list of complaints. See building defect reports.

Step 3: Write to the builder

Send the report and ask the builder to fix the defects by a reasonable date. Keep it factual. Allow access for the builder to inspect and repair.

Step 4: NSW Fair Trading

If the builder does not respond or disputes the defects, NSW Fair Trading has a complaint and dispute resolution service for home building work. A Fair Trading building inspector may visit, and in some cases a rectification order can be issued. See after a defect report.

Step 5: NCAT

If the dispute is still not resolved, you can apply to NCAT. For claims over $30,000, expert evidence must follow Procedural Direction 3. See NCAT expert reports.

Watch the time limits

Defect typeStatutory warranty period
Major defects6 years from completion
Other defects2 years from completion

These come from the Home Building Act 1989. Time limits can be complex, so get legal advice early. See time limits for claims.

What not to do

  • Do not get the defects fixed by someone else before they are documented, unless urgent for safety.
  • Do not stop the builder from inspecting the defects.
  • Do not withhold money without legal advice.
  • Do not let time limits run out while you wait.

Defect reports in Sydney

We inspect, document and cost defects in new homes, extensions and renovations. METCON is a licensed builder (384697C) and DBP registered (BUP4254812), and we fix building defects for a living. Call 0415 840 500 or request a report or quote. We confirm a fixed fee before we start.

This article is general information, not legal advice. For your situation, speak to a lawyer, NSW Fair Trading or the Tribunal.

Frequently asked questions

What counts as a major defect?

Broadly, a defect in a major element of the building, such as the structure, waterproofing or fire safety, that causes or is likely to cause the building to be uninhabitable, collapse or be destroyed. Get advice on your specific defect.

Can I fix urgent defects myself?

Make the building safe first, but document the defect properly before repair and tell the builder in writing.

What if my builder has gone broke?

You may be able to claim on the Home Building Compensation Fund. See our guide to HBCF claims.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Inspections & Reports
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Need a report for NCAT, court or insurance?

Fixed fee agreed before we start. Clear findings, an itemised scope and a fixed-price rectification quote.

Call now Request Report