After a storm, burst pipe or leak, your insurer will want to know two things: what caused the damage, and what it will cost to repair. A builder's report that answers both clearly gives your claim the best chance of being accepted and paid fairly.
Cause is the first question
Most home and strata policies cover sudden events such as storms, impact and bursting pipes. Many exclude wear and tear, gradual damage, lack of maintenance and defective building work. So the cause, and how long the damage has been happening, matters a lot.
| Often covered | Often excluded |
|---|---|
| Storm damage to roofs and walls | Wear and tear |
| A pipe that suddenly bursts | A slow leak over months |
| Impact from a fallen tree | Rot, rust and deterioration |
| Sudden water entry in a storm | Defective waterproofing or workmanship |
Every policy is different. Read your product disclosure statement. See insurance and gradual leaks.

What the report should include
- When the inspection happened and who did it.
- A description of the event as reported.
- An opinion on the cause, with reasons.
- Photos of all damage, room by room.
- Moisture readings where water is involved.
- A scope of repairs, including likely hidden damage.
- An itemised, fixed-price repair quote.
Make safe first
If the building is unsafe or still letting water in, make it safe straight away and keep records. Most policies expect you to prevent further damage. See make safe works.
Hidden damage
Water travels. Damage behind linings, under floors and in wall cavities is common. A good scope allows for opening up and states what happens if more damage is found.
Strata buildings
In apartment buildings, damage often crosses common property and lots. The strata policy usually covers the building, and lot owners need their own contents cover. A clear report on where damage started helps sort out responsibility. See strata insurance and leaks.
If your claim is declined
See claim declined for wear and tear.
Insurance reports in Sydney
We inspect, report on cause, scope the repairs and price them at a fixed price. See insurance reports and quotes. METCON is a licensed builder (384697C) and DBP registered (BUP4254812), and we fix building defects for a living. Call 0415 840 500 or request a report or quote. We confirm a fixed fee before we start.
This article is general information, not legal advice. For your situation, speak to a lawyer, NSW Fair Trading or the Tribunal.
Frequently asked questions
Does my insurer have to use my builder's quote?
No. Insurers often get their own assessment or use their own builders. A detailed report and quote helps you check their scope and negotiate if needed.
Should I start repairs before the insurer approves?
Make the building safe and prevent further damage, but check with your insurer before permanent repairs. Keep photos and receipts.
Can you report on an old leak?
Yes. We can give an opinion on how long damage has likely been occurring based on what we find, which can matter for cover.


