Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Reports

Make Safe Repairs After Storm or Water Damage

18 November 2026 · 4 min read · By the METCON team

After storm or water damage, the first job is to stop things getting worse. Insurers call this "make safe" work. Doing it properly, and recording it, protects both your building and your claim.

What make safe work is

  • Temporary roof covers and tarps.
  • Stopping water at the source, such as isolating a burst pipe.
  • Propping or securing damaged structures.
  • Removing dangerous debris and loose materials.
  • Isolating electrical circuits affected by water, by a licensed electrician.
  • Starting to dry out wet areas.
Temporary propping makes a damaged structure safe.
Temporary propping makes a damaged structure safe.

What insurers expect

Most policies require you to take reasonable steps to prevent further damage. If you leave a hole in the roof for weeks, extra damage may not be covered. Tell your insurer early and follow their instructions.

Record everything

  1. Photos and video of all damage before any clean-up, with dates.
  2. Notes of when the event happened and what you saw.
  3. Damaged items kept, or photographed before disposal.
  4. Receipts for any emergency work.
  5. Names and contact details of everyone who attends.

Make safe vs permanent repairs

Make safePermanent repairs
Straight awayAfter the insurer agrees the scope
Temporary and protectiveRestores the building properly
Usually covered as part of the claimCovered if the claim is accepted

Hidden water damage

Water in ceilings, walls and floors can lead to mould, swelling and rot. Moisture readings at make safe stage give a baseline. See mould after a leak.

Strata buildings

Tell the strata manager or building manager immediately. Common property make safe work is usually arranged by the owners corporation. See strata emergency leaks.

Make safe and reports in Sydney

We carry out make safe works and prepare the report and fixed-price repair quote your insurer needs. See insurance reports. METCON is a licensed builder (384697C) and DBP registered (BUP4254812), and we fix building defects for a living. Call 0415 840 500 or request a report or quote. We confirm a fixed fee before we start.

This article is general information, not legal advice. For your situation, speak to a lawyer, NSW Fair Trading or the Tribunal.

Frequently asked questions

Do I need my insurer's approval for make safe work?

Emergency work to prevent further damage usually should not wait, but tell your insurer as soon as you can and keep records.

Who pays for make safe works?

Usually it forms part of an accepted claim. If the claim is declined, you may have to pay. Ask your insurer.

How long can a tarp stay on a roof?

Only as long as needed for the permanent repair. Tarps fail in wind and can cause more damage if left too long.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Inspections & Reports
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Need a report for NCAT, court or insurance?

Fixed fee agreed before we start. Clear findings, an itemised scope and a fixed-price rectification quote.

Call now Request Report