Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Remedial

Mould After a Leak: What to Do in the First Week

4 November 2026 · 4 min read · By the METCON team

Whether it was a burst pipe, a leaking balcony or a storm, what you do in the first few days after water gets in makes a big difference. Mould can begin to grow on damp materials within a day or two, and it often grows where you can't see it.

First 24 hours

  1. Stop the water, if it is safe. Turn off the water or call a plumber or your building manager.
  2. Stay safe. Keep away from wet electrics, and have an electrician check anything doubtful.
  3. Take photos and notes. Show what happened and what has been damaged.
  4. Notify the right people: insurer, landlord, strata manager or building manager. See strata leak emergencies.
  5. Remove standing water with a wet vacuum, mop or towels.
  6. Move belongings out of the wet area and lift furniture off wet floors.
Stripping out damaged materials so a room can dry properly.
Stripping out damaged materials so a room can dry properly.

Days 2 to 3

  • Dry it out. Open windows when it is dry, and use fans and a dehumidifier. For a big area, get professional drying equipment.
  • Lift wet carpet and underlay. Underlay usually needs replacing. Ask your insurer before throwing anything out.
  • Check behind things. Look behind wardrobes, skirting boards and bathroom vanities.
  • Don't paint yet. Painting damp walls traps moisture and hides the problem.

Days 4 to 7

  • Check moisture levels. A wall can feel dry on the surface and still be wet inside. A builder or restorer can test with a moisture meter.
  • Remove wet plaster and insulation if it has not dried. Soaked plasterboard, ceiling linings and insulation often need to be cut out.
  • Find and repair the cause. If you do not fix the source, the problem will come back.

What to throw away, and what to keep

Usually replaceUsually keep if cleaned and dried
Carpet underlay and soaked insulationSolid timber and metal furniture
Soaked plasterboard and ceiling liningsTiles, glass and hard surfaces
Mattresses and soft furnishings with mould or dirty waterWashable clothing and fabrics

Water from a sewer or flood may be contaminated, so it needs professional cleaning.

If mould has already started

Small patches on hard surfaces can usually be cleaned with a suitable cleaner, with gloves, mask and ventilation. Large areas, repeated growth or mould in ceilings or walls generally need more. See mould removal vs remediation. If you or your family are unwell, or someone is vulnerable, speak to your GP.

How building repairs help

Permanent repairs stop the water, replace what can't be saved and get the home properly dry, so you're not dealing with musty smells and repeat mould months later. See signs of hidden water damage.

Help after a leak

We find leaks, repair the building and remove damaged materials. See our mould remediation service. Call 0415 840 500 or book a free inspection.

Frequently asked questions

How fast does mould grow after a leak?

It can start within a day or two on damp materials, especially when it is warm and there is little airflow.

Should I throw out wet plasterboard?

If it is soaked, sagging or has been wet for days, it usually needs to be replaced. Lightly affected areas may dry, but check with a moisture meter.

Will insurance pay for mould after a leak?

It depends on your policy and the cause. Sudden events are more likely to be covered than gradual leaks. Report quickly and speak to your insurer.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Structural Remediation
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote