By the time water damage is obvious, it has often been going on for months. Catching the early signs saves money and stops rot, mould and corrosion taking hold.
12 signs of hidden water damage
- Musty smell that does not go away with airing.
- Bubbling or peeling paint on walls or ceilings.
- Stains on ceilings, often brown rings.
- White salt deposits on brickwork, plaster or concrete. See efflorescence.
- Mould in corners, behind furniture or around windows. See mould as a building problem.
- Swollen skirting, door frames or cabinets.
- Loose or cracked tiles, and grout that keeps cracking around the shower.
- Soft or springy floors, especially near bathrooms.
- Sticking doors and windows from swollen timber.
- Rust stains on concrete, a sign of corroding steel. See concrete cancer in houses.
- A higher water bill with no change in use, which can point to a hidden pipe leak.
- Damp carpet or floors near balcony doors. See balcony door leaks.

Where to look
- Under and around showers, baths and vanities.
- Ceilings below bathrooms, balconies and roofs.
- Walls at ground level, for rising damp.
- Around windows and doors.
- Under the house, in the subfloor. See damp subfloors.
- In the garage, under slabs and driveways. See leaking garages.
What to do next
- Photograph what you find, with dates.
- Check obvious causes, such as blocked gutters or a dripping tap.
- Turn off the water at the meter and watch it to check for hidden pipe leaks.
- Get a leak investigation if the cause is not obvious.
- Fix the source before repairing the damage.
Why acting early matters
Water rots timber, corrodes steel, grows mould and damages plaster. A small fix now avoids a large repair later. See the cost of delaying repairs.
Leak investigation and repair
We trace and fix leaks in houses and apartments across Sydney. METCON is a licensed builder (384697C) with heritage and structural remedial experience across Sydney. Call 0415 840 500 or book a free inspection.
Frequently asked questions
How can I tell if there is water damage behind a wall?
Look for bubbling paint, stains, a musty smell, swollen skirting, mould and loose tiles. A moisture meter or thermal camera can confirm it.
Can I check for a hidden water leak myself?
Turn off all taps and watch the water meter. If it keeps moving, there may be a hidden leak in the pipes.
Should I repair the damage or find the leak first?
Find and fix the leak first, then let the area dry before repairing finishes. Otherwise the damage will come back.

