Many Sydney homes have a garage tucked under the house, a terrace, a deck or a driveway, especially on sloping sites. When it leaks, water drips on cars and storage, stains the ceiling and corrodes the slab overhead.
Where the water comes from
- A terrace or balcony above with a failed membrane. See roof terrace waterproofing.
- A driveway or parking slab above with cracks and no waterproofing.
- Planter boxes built against or over the garage. See planter box waterproofing.
- Retaining walls with groundwater coming through.
- Joints between the slab and walls.
- Plumbing from a bathroom or laundry above.

Signs to watch for
- Drips and stains on the ceiling, often along cracks.
- White deposits or stalactites hanging from the slab.
- Rust stains and spalling concrete. See concrete cancer in houses.
- Damp walls and puddles after rain.
Finding the source
We map where water appears, then test the areas above one at a time: the terrace, the planter, the driveway, the plumbing. That tells us which part to fix.
Repair options
- Re-waterproof the terrace or deck above: the lasting fix when the membrane has failed.
- Crack and joint injection from below for specific cracks. See crack injection.
- Concrete repairs where steel has corroded.
- Drainage behind retaining walls and at the garage entry.
- Negative-side waterproofing on walls where outside access is not possible. See basement leak repair.
How fixing it helps your home
A dry garage protects your cars and storage, stops corrosion in the slab that holds up the terrace or house above, and avoids expensive structural repairs later.
Garage leak repairs
We have repaired leaking garage ceilings for homes and strata buildings across Sydney. METCON is a licensed builder (384697C) with heritage and structural remedial experience across Sydney. Call 0415 840 500 or book a free inspection.
Frequently asked questions
Why is my garage ceiling leaking?
Usually the terrace, driveway, deck or planter above has failed waterproofing or cracks, letting rainwater through the slab.
Can a garage leak be fixed from underneath?
Specific cracks can be injected from below, but if the membrane above has failed, re-waterproofing from the top is the lasting fix.
Is a leaking garage slab a structural problem?
It can become one. Water corrodes the reinforcement and causes concrete cancer, so it is worth fixing early.

