Skylights bring in light, but they also put a hole in the roof. When one leaks, the water usually shows on the ceiling around it or drips from the frame. The fix depends on whether it is a true leak or condensation.
Leak or condensation?
| Leak | Condensation |
|---|---|
| Appears during or after rain | Appears on cold mornings, even without rain |
| Stains on the ceiling around the opening | Droplets on the glass and frame |
| Worse in wind-driven rain | Worse in steamy rooms such as bathrooms |

Common causes of skylight leaks
- Failed or poorly installed flashings.
- Perished seals and gaskets around the glazing.
- Cracked or damaged glazing or domes.
- Leaves and debris holding water above the skylight.
- Cracked or slipped roof tiles nearby.
- On flat roofs, failed membrane upstands around the skylight. See flat roof waterproofing.
How it is repaired
- Clearing debris and checking the roof around the skylight.
- Replacing seals or glazing.
- Re-flashing the skylight to the roof.
- Re-waterproofing upstands on flat roofs.
- Replacing old skylights where they have reached the end of their life.
- Repairing the ceiling and light well once it is dry. See water damaged ceilings.
For condensation
Improve ventilation, use exhaust fans and consider double glazed or insulated skylights.
In apartment buildings
Skylights in top-floor apartments or common areas may be common property. Check with your strata manager.
How the repair helps
A quick fix protects ceilings and insulation, prevents mould and keeps the light without the drips.
Skylight leak repairs
We find and fix roof and skylight leaks and repair the damage inside. Call 0415 840 500 or book a free inspection.
Frequently asked questions
Why is my skylight leaking?
Common causes are failed flashings or seals, damaged glazing, debris and nearby roof damage. Condensation can also look like a leak.
How do I know if it is condensation or a leak?
Leaks appear with rain. Condensation appears on cold mornings, often without rain, and on the glass itself.
Should an old skylight be repaired or replaced?
If the frame and glazing are sound, repairs can work. Old, cracked or poorly installed skylights are often better replaced.

