Brick front and boundary fences are common in older Sydney suburbs. Over time they crack, lean and lose mortar. A leaning brick fence can be dangerous, especially beside footpaths and driveways, so it pays to deal with it early.
Why brick fences lean and crack
- Shallow or no footings.
- Tree roots and clay soil movement. See tree roots.
- Soil built up on one side, so it acts as a retaining wall it was never designed to be.
- Rusted steel in piers and gates.
- Vehicle impact.
- Failed mortar and fretting bricks. See brick fretting.

When is it unsafe?
- It leans noticeably, or the lean is increasing.
- Cracks go right through the wall.
- Piers are loose or rocking.
- It is holding back soil and bulging.
Keep people clear, especially children, and get it checked.
Repair or rebuild?
| Repair | Rebuild |
|---|---|
| Minor cracks and failed mortar | Significant lean or movement |
| Sound footings | No or failed footings |
| Local damage, such as one pier | Long sections affected |
Repairs include repointing, stitching and rebuilding piers. Rebuilding can reuse original bricks to keep the look.
Approvals
Rebuilding a front fence may need council approval, especially in heritage conservation areas or if the height or design changes. Check first. See heritage approvals.
Sharing costs with neighbours
For dividing fences between neighbours, the NSW Dividing Fences Act 1991 generally provides for costs of a sufficient fence to be shared. Talk to your neighbour first, and check the Act or get advice if you cannot agree.
How the repair helps
A solid fence is safer, looks better from the street and adds to your home's street appeal.
Brick fence repairs
We repair and rebuild brick fences and piers, matching original bricks where possible. Call 0415 840 500 or book a free inspection.
Frequently asked questions
Is a leaning brick fence dangerous?
It can be. A leaning brick fence can fall with little warning. Keep people clear and get it checked.
Can a leaning brick fence be straightened?
Usually not reliably. Badly leaning sections are generally taken down and rebuilt on proper footings.
Do neighbours share the cost of a brick fence?
For dividing fences, the NSW Dividing Fences Act 1991 generally provides for sharing the cost of a sufficient fence. Talk to your neighbour first.