Can Tree Roots Damage House Foundations? Signs and Fixes

5 November 2026 · 4 min read · By the METCON team

Sydney's big street and garden trees are part of what makes suburbs like Strathfield, Stanmore and Concord so attractive. But trees and old footings do not always get on. Roots are more often a problem because of what they do to the soil, rather than pushing directly on a wall.

How trees cause damage

  • Drying clay soil: this is the most common cause. Roots draw out moisture, the clay shrinks and footings settle. See clay soils.
  • Getting into pipes: roots enter old sewer and stormwater pipes. Leaks then soften soil and cause movement.
  • Direct pressure: larger roots can lift paths, driveways, fences and light structures.
  • Dropping leaves: blocked gutters and box gutters cause overflows. See box gutter leaks.
Wall repairs are done once the cause of movement has been dealt with.
Wall repairs are done once the cause of movement has been dealt with.

Signs to look for

  • Cracks on the side of the house closest to a tree.
  • Cracks that widen during dry weather.
  • Sticking doors or sloping floors on that side.
  • Blocked or backed-up drains.
  • Lifted paving and paths.

What to do first

  1. Record cracks with dated photos.
  2. Have drains and sewer lines checked with a camera.
  3. Ask a structural engineer whether the tree is really the cause.
  4. Ask an arborist for advice on the tree's health, pruning and impact.
  5. Check with your council before pruning or removing any tree. Permission is commonly needed.

Why removing the tree is not always the answer

Taking out a big tree on clay soil can make things worse, because the soil may swell as moisture comes back. That swelling can cause more movement for some time. Get engineering advice first.

How it is repaired

  • Pipe repairs: to stop leaks and root entry.
  • Root barriers: installed in some situations to redirect roots, with arborist input.
  • Moisture management: drainage, and steady moisture around the house.
  • Underpinning: where footings have moved and need help. See do I need underpinning?
  • Crack repairs: stitching, repointing and finishes once it is stable. See brick stitching.

What if it's a neighbour's or council tree?

Talk to the neighbour or council and keep records. In NSW, the Trees (Disputes Between Neighbours) Act 2006 lets the Land and Environment Court deal with some neighbour tree disputes, including tree-related damage. Legal advice can help you work out your options.

How it helps your home

Finding and fixing the true cause keeps your home stable, and may allow you to keep a tree you love. It also avoids costly repairs that fail because the cause was missed.

Worried about a tree?

We inspect cracks and footings and work with engineers and arborists to find the real cause. Call 0415 840 500 or book a free inspection.

Frequently asked questions

Can tree roots crack a house?

Yes, usually indirectly. On clay soils, roots dry the ground and footings move. Roots can also damage pipes, and leaks then affect the footings.

Should I cut down a tree that is near my house?

Get advice first. Removing a big tree can cause clay to swell and create more movement. Check with council, because approval is commonly needed.

How far should a tree be from a house?

It depends on the species, soil and footings. An arborist and engineer can advise for your site.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Civil & Structural
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote