Basements and basement carparks sit against wet ground, so water is always trying to get in. Leaks often appear during or after heavy rain, through walls, joints, the floor or where services pass through.
Common causes
- Cracks in basement walls and slabs.
- Construction joints between pours that were never sealed properly.
- Failed external waterproofing, or none at all.
- Penetrations for pipes and conduits.
- Groundwater pressure rising after rain.
- Blocked or failed drainage around the building.
- Leaking planters and podiums above. See basement and planter box waterproofing.
Diagnosis
Mapping where water appears, when, and how much, then checking cracks, joints, drains and anything above. Leaks only during rain point to surface or groundwater; constant leaks can point to plumbing.
Repair options
Crack and joint injection
Polyurethane resins injected into leaking cracks and joints expand to block water paths. Effective for active leaks through defined cracks.
Negative-side waterproofing
Coatings, crystalline treatments or membranes applied on the inside face when the outside cannot be reached.
External waterproofing
Excavating to waterproof the outside of the wall. Most effective but often impractical against boundaries.
Drainage
Ag drains, sumps and pumps to manage water that gets in or relieve pressure outside.
Do not ignore it
Water in basements corrodes reinforcement, damages stored goods and services, and causes mould and slip hazards.
Basement leak repairs
We diagnose the source and recommend the repair that suits your building. See our waterproofing service or call 0415 840 500.
Frequently asked questions
Why does my basement leak only when it rains?
Rain raises surface and groundwater levels, pushing water through cracks, joints and failed waterproofing.
Can basement leaks be fixed from the inside?
Often. Injection into cracks and joints and negative-side waterproofing are common inside repairs.
Is a leaking basement a structural problem?
It can become one, because water corrodes reinforcement over time. Fixing leaks early protects the structure.


