When water comes through a ceiling, one of the first questions is whether insurance will pay. The answer depends on what caused the leak, what was damaged and what the policy says.
This is general information only. Every policy is different. Read your policy wording and talk to your strata manager or insurance broker.
What strata building insurance usually covers
Strata building insurance is taken out by the owners corporation to cover the building. Policies often cover sudden and accidental water damage, such as:
- A burst pipe or failed flexible hose.
- Storm damage, such as a roof torn off or a tree through a window.
- The resulting damage to the building, such as ceilings, walls and floors.
Some policies also cover the cost of finding the source of a leak.

What it usually does not cover
- Gradual leaks that have happened over a long time.
- Wear and tear, such as a balcony membrane at the end of its life.
- Defective work or design, such as a membrane that was never installed properly.
- The cost of fixing the cause, such as replacing a failed membrane, even where resulting damage is covered.
- Maintenance issues, such as blocked gutters or drains.
This is why many balcony leaks, shower leaks and concrete cancer repairs are not covered by insurance and are paid for by the owners corporation or a lot owner instead.
Contents and lot owner insurance
Strata building insurance does not usually cover residents' belongings. Your carpet, furniture and possessions are covered by your own contents insurance, if you have it. Some policies treat carpets and fixtures differently, so check.
Who pays to fix the leak itself?
That depends on where the problem is and who is responsible for it:
- Common property, such as balcony slabs and, in many schemes, membranes, roofs and facades, is generally the owners corporation's responsibility.
- Lot property, or items the owner has altered or installed, may be the owner's responsibility.
- By-laws can change who maintains what.
See who is responsible for repairs in strata, water leaking from the apartment above and who pays for balcony concrete cancer.
New buildings
In a newer building, a leak may be a building defect covered by statutory warranties or the strata building bond rather than insurance. Get it documented before it is repaired. See waterproofing defects in new apartments.
What to do when water comes in
- Stop the water if you can, and protect belongings.
- Take photos and videos of the leak and the damage, with dates.
- Tell your strata manager straight away. Delays can affect claims.
- Arrange for the source to be found by a leak detection specialist or builder.
- Keep reports and invoices for the insurer.
Fixing the cause
Insurance may repair the ceiling, but if the membrane or the waterproofing that failed is not fixed, the leak will come back. We find and fix the source of leaks in apartment buildings, and provide reports that help strata managers deal with insurers. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
Does strata insurance cover a leaking balcony?
Usually it does not cover fixing the failed membrane, because that is wear and tear or a defect. It may cover sudden resulting damage, depending on the policy.
Who pays when water leaks from the unit above?
It depends on the source. Common property leaks are usually the owners corporation's responsibility, while leaks from a lot owner's fixtures may be theirs. Insurance may cover sudden resulting damage.
Will insurance pay for leak detection?
Some strata policies include cover for finding the source of a leak. Check your policy wording with your strata manager or broker.


