Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Reports

What Happens at a Building Expert Inspection?

20 November 2026 · 4 min read · By the METCON team

If you have engaged a building expert for a dispute, defect claim or insurance report, it helps to know what happens on the day. A well-prepared inspection is quicker, more thorough and gives a better report.

Before the visit

  • Fixed fee and brief: we confirm the purpose, scope and fee in writing.
  • Documents: contract, plans, variations, photos, correspondence, any previous reports and any NCAT or court directions.
  • Your defect list: a simple room by room list of what concerns you.
  • Access: roof, subfloor, balconies, units above or below, and keys for locked areas.
Each item is photographed and located during the inspection.
Each item is photographed and located during the inspection.

On site

  1. A short talk through your concerns and the history.
  2. A walk through the whole property, not only the listed items.
  3. Close inspection of each item, with measurements, levels and moisture readings.
  4. Photos of every item, with a scale where useful, and locations noted.
  5. Testing where needed and agreed: flood tests, moisture mapping, or a small inspection opening.

How long it takes

A bathroom or single issue may take an hour or so. A whole house or apartment building takes longer. Testing such as flood tests can add time.

What the expert will not do

  • Agree that everything is a defect. The expert's duty is to give an honest opinion.
  • Give legal advice about your case.
  • Carry out destructive testing without your agreement.

After the visit

The report sets out each item: what it is, why it is or is not defective, how it should be fixed and what it costs. For NCAT and court reports, it includes the declarations the rules require. See NCAT expert reports.

If the other side attends

Sometimes the builder or their expert attends. Keep it calm and factual. Let the experts talk about technical points. See expert conclaves.

Book an expert inspection

We inspect and report for NCAT, courts, insurers and negotiations across Sydney. See inspections and reports. The fee is fixed and agreed in writing before the inspection, so you know the cost of the report before you commit. METCON is a licensed builder (384697C) and DBP registered (BUP4254812), and we fix building defects for a living. Call 0415 840 500 or request a report or quote. We confirm a fixed fee in writing before we start.

This article is general information, not legal advice. For your situation, speak to a lawyer, NSW Fair Trading or the Tribunal.

Frequently asked questions

Do I need to be there?

It helps, at least at the start, to show the issues. You do not need to follow the expert around the whole time.

Can the expert inspect the unit above?

Only with that owner's permission. Arrange it in advance, often through the strata manager.

How soon will I get the report?

We agree the timeframe with the fee. Tell us about any deadlines when you call.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Inspections & Reports
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Need a report for NCAT, court or insurance?

Fixed fee agreed before we start. Clear findings, an itemised scope and a fixed-price rectification quote.

Call now Request Report