How to Lodge a Home Building Claim at NCAT: Step by Step

19 November 2026 · 4 min read · By the METCON team

If your builder will not fix defective or incomplete work, the NSW Civil and Administrative Tribunal (NCAT) is where most home building disputes end up. The process is designed for people without lawyers, but it rewards those who prepare. Here is the path, step by step.

Step 1: Put it in writing to the builder

List the defects, attach photos and ask the builder to fix them by a reasonable date. Keep it factual. This letter becomes part of your evidence.

Step 2: Go to NSW Fair Trading

NCAT says home building disputes must first be referred to NSW Fair Trading. Fair Trading may arrange a site visit by one of its building inspectors and try to get the parties to agree on what is fixed and when. If that fails, keep the Fair Trading paperwork, because the NCAT application form asks for it. Some matters are exempt, such as a contractor recovering a debt, so check the current NCAT form.

Step 3: Get your evidence together

  • The contract, plans, specifications and any variations.
  • Payment records and invoices.
  • Photos and videos, dated.
  • All correspondence with the builder.
  • The Fair Trading outcome.
  • An expert report and itemised rectification costs.

NCAT's home building guideline expects applicants to have obtained the expert reports they need before lodging. For claims over $30,000, Procedural Direction 3 applies to expert evidence. See Procedural Direction 3 explained.

Step 4: Decide what you are asking for

You can ask for a work order (the builder comes back and fixes it) or a money order (the builder pays for someone else to fix it). The Home Building Act prefers rectification by the responsible party, so if you want money instead, explain why. See work order or money order.

Step 5: Lodge the application

Lodge the home building application online or on the form, with the fee, the Fair Trading paperwork and the amount claimed. The general limit for home building claims is $500,000.

Step 6: The first listing

Claim amountWhat usually happens first
$30,000 or lessConciliation and hearing, often on the same day.
Over $30,000Directions hearing, with a timetable for evidence.

Step 7: Evidence, Scott Schedule and conclave

The Tribunal will usually set dates to file evidence. It may order a Scott Schedule listing each defect and both sides' positions, and an expert conclave. Missing a direction can sink a good claim, so diarise every date.

Step 8: Hearing and orders

At the hearing, the member decides each item on the evidence. See what to expect at an NCAT hearing.

Where we help

We prepare NCAT expert reports, Scott Schedule responses and fixed-price rectification quotes. METCON is a licensed builder (384697C) and DBP registered (BUP4254812), and we fix building defects for a living. Call 0415 840 500 or request a report or quote. We confirm a fixed fee in writing before we start.

This article is general information, not legal advice. For your situation, speak to a lawyer, NSW Fair Trading or the Tribunal.

Frequently asked questions

Do I need a lawyer for NCAT?

Not always. Many home owners represent themselves, especially in smaller claims. In larger or complex claims, legal advice is worth getting, and the Tribunal can give leave for representation.

When should I get the expert report?

Before you lodge, if you can. The report tells you what the claim is worth and whether it is strong, and NCAT expects applicants to have their expert evidence ready.

How long does an NCAT building claim take?

Smaller claims can be resolved in a few months. Larger claims with directions, expert evidence and conclaves take longer. Delays in getting evidence are the most common cause of slow claims.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Inspections & Reports
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles