Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Reports

Disagree With Your Insurer's Scope of Works? What to Do

19 November 2026 · 4 min read · By the METCON team

Your claim was accepted, which is good news. Then the insurer's scope of works or cash settlement arrives, and it does not look like it will fix the problem. It patches a ceiling but not the leak above it. It retiles half a wall. It assumes a membrane can be repaired when it needs replacing. Here is how to deal with it.

Get the scope in writing

Ask for the full scope of works and any assessor or builder report it was based on. You cannot challenge a scope you have not seen.

Compare it line by line

Common gaps we find in insurer scopes:

  • The cause of the damage is not fixed, only the visible result.
  • Removal and making good are missing, such as tiles, skirting or cabinetry that must come out.
  • Matching is ignored, leaving a visible patch in a uniform finish.
  • Access, scaffold, waste and protection are under-allowed.
  • Compliance items, such as current waterproofing standards for a rebuilt wet area, are missing.
  • Rates that no licensed builder would work for.

Get an independent scope and quote

An independent builder inspects, writes a scope that will actually fix the insured damage, and prices it item by item. Laid next to the insurer's scope, the differences become clear and specific. That is what an insurer can respond to.

Cash settlement offers

If the insurer offers cash instead of repairs, check whether the amount would let a licensed builder do the work properly. If a builder you trust cannot do it for that figure, a fixed-price quote shows why.

Internal review and AFCA

  1. Write to the insurer, explain the disagreement and attach the independent scope and quote.
  2. If that fails, use the insurer's internal complaints process. Insurers generally respond within 30 calendar days.
  3. If you are still not satisfied, you can complain to the Australian Financial Complaints Authority (AFCA).

Strata buildings

For damage in strata buildings, the owners corporation's building policy usually responds to the building. Owners and strata managers can use the same approach. See strata insurance and leaks.

Independent scopes and quotes

We prepare insurance reports and repair quotes that set out a scope that will last. The fee is fixed and agreed in writing before the inspection, so you know the cost of the report before you commit. METCON is a licensed builder (384697C) and DBP registered (BUP4254812), and we fix building defects for a living. Call 0415 840 500 or request a report or quote. We confirm a fixed fee in writing before we start.

This article is general information, not legal advice. For your situation, speak to a lawyer, NSW Fair Trading or the Tribunal.

Frequently asked questions

Will the insurer just accept my builder's quote?

Not automatically. But a clear scope that explains why each item is needed often leads to the scope being revised.

Can the insurer's builder do the work if I disagree with the scope?

Raise your concerns in writing before work starts. Once it is done, gaps are harder to fix.

Is a cash settlement final?

Read the settlement terms carefully before accepting. Some are final for the claim. Get advice if unsure.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Inspections & Reports
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Need a report for NCAT, court or insurance?

Fixed fee agreed before we start. Clear findings, an itemised scope and a fixed-price rectification quote.

Call now Request Report