Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Reports

Neighbour's Building Work Damaged My House: What Now?

18 November 2026 · 4 min read · By the METCON team

Excavation, demolition, piling and heavy machinery next door can crack walls, move footings and damage paths and fences. If it happens to you, the key question is: what changed because of the work?

Step 1: Record the damage now

  • Dated photos of every crack, with a ruler or coin for scale.
  • Notes of when you first saw each one.
  • Video of doors or windows that now stick.
  • Notes of what work was happening next door at the time.
Record crack locations and widths with a scale for comparison later.
Record crack locations and widths with a scale for comparison later.

Step 2: Find the dilapidation report

For excavation near boundaries, councils often require a pre-construction dilapidation report of neighbouring properties. Ask the neighbour or their builder for a copy of the report on your property. It is the before picture. See dilapidation reports.

Step 3: Tell them in writing

Write to your neighbour and their builder describing the damage, attaching photos. Ask them to notify their insurer. Builders usually carry contract works and public liability insurance.

Step 4: Get an independent report

A post-construction inspection compared against the dilapidation report shows which cracks are new or worse. Where there was no report, an expert can still give an opinion on whether the damage is consistent with the work next door. A repair scope and cost follows.

Common damage from works next door

DamageOften caused by
Diagonal cracks near windows and doorsFooting movement from excavation
Cracked render and cornicesVibration
Sticking doors and windowsMovement of the structure
Cracked paths, fences and retaining wallsLoss of support or machinery

Step 5: Your own insurer

Your home insurer may cover the damage and recover from the neighbour's insurer. Check your policy.

If it is serious

If cracking is growing quickly or doors suddenly jam, ask for the work to stop and get an engineer to check the structure. See are cracks serious.

Damage reports in Sydney

We prepare pre and post-construction dilapidation reports and fixed-price repair quotes for damage claims. See dilapidation reports. METCON is a licensed builder (384697C) and DBP registered (BUP4254812), and we fix building defects for a living. Call 0415 840 500 or request a report or quote. We confirm a fixed fee before we start.

This article is general information, not legal advice. For your situation, speak to a lawyer, NSW Fair Trading or the Tribunal.

Frequently asked questions

Is my neighbour responsible for damage from their works?

Often the person carrying out the work and their builder can be liable if their work caused the damage. Get legal advice for your situation.

What if there was no dilapidation report?

An expert can still assess the damage and whether it is consistent with the works. It is harder, so record everything early.

Should I let their builder inspect my house?

Usually yes, it helps resolve claims. Keep your own records and get your own report.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Inspections & Reports
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Need a report for NCAT, court or insurance?

Fixed fee agreed before we start. Clear findings, an itemised scope and a fixed-price rectification quote.

Call now Request Report