Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Structural

Types of Cracks in Walls and How Structural Cracks Are Fixed

7 October 2026 · 4 min read · By the METCON team

The shape, direction and width of a crack say a lot about what caused it. This guide covers the common types of cracks in walls, what they usually indicate, and how structural cracks are fixed. For a quick check of whether yours is serious, see are cracks in walls serious?

Hairline cracks

Very fine cracks, often in plaster or render, usually caused by shrinkage or minor seasonal movement. Generally cosmetic and fixed when repainting.

Vertical cracks

Straight up-and-down cracks, often near the middle of long walls or at junctions. Commonly caused by shrinkage or thermal movement. If wide or growing, they can indicate footing movement.

Diagonal cracks

Cracks running at an angle, often from the corners of windows and doors. These are a classic sign of differential footing movement, where one part of the building moves more than another. Common on Sydney's reactive clay soils.

Stepped cracks

Cracks that follow the mortar joints of brickwork in a staircase pattern. Like diagonal cracks, they usually point to movement in the footings or the wall.

Horizontal cracks

Cracks running along a wall, often along mortar joints. In brick walls these can indicate corroded wall ties or the outer skin of brick moving away from the structure. In retaining or basement walls, they can mean soil pressure. Horizontal cracks deserve prompt inspection.

Cracks above windows and doors

Cracks starting at the corners of openings, sometimes with rust staining, often mean a corroded steel lintel is expanding and lifting the brickwork.

Dangerous wall cracks

  • Wider than about 5mm, or growing.
  • One side of the crack out of line with the other.
  • Walls bulging or leaning.
  • Doors and windows suddenly sticking.
  • Cracks through bricks rather than around them.

How structural cracks are fixed

  1. Diagnose the cause, with an engineer for significant cracking.
  2. Fix the cause: drainage, leaking pipes, trees, lintels, wall ties or footings.
  3. Repair the wall: helical crack stitching, brick replacement, epoxy injection or rebuilding sections.
  4. Make good with matched mortar, render and paint.

Crack repairs in Sydney

See our wall and structural crack repair service.

Frequently asked questions

Which wall cracks are dangerous?

Cracks wider than about 5mm, growing cracks, cracks where one side is out of line, bulging walls and horizontal cracks in brick walls should be inspected promptly.

What do diagonal cracks from windows mean?

Usually differential footing movement, or sometimes a corroded lintel above the opening.

How do you fix structural cracks in walls?

Fix the cause first, then repair the wall with crack stitching, brick replacement or injection, and make good the finishes.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Civil & Structural
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote