Looking for underpinning in Hurstville? METCON is a licensed Sydney builder delivering underpinning across Hurstville and the wider St George. When a home starts to move, crack or settle unevenly, underpinning is often the work that restores stability. It strengthens and stabilises existing foundations that are no longer holding the building as they should, usually because of reactive soil, poor drainage, old footings or ground movement over time.
Hurstville, in the heart of the St George area, has a wide mix of older homes, post-war builds and established blocks. Reactive clay soils and ageing foundations across the area mean foundation movement, cracking and the need for underpinning are common. As a local St George builder, this is home territory for us.
Underpinning is not a job for guesswork. It involves excavating beneath existing footings in controlled stages, then extending the foundation down to stable bearing material or installing engineered support. Done wrong, it can make movement worse. Done properly, with a structural engineer, the right sequencing and full documentation, it can add decades of stability to a home.
The signs that a property may need underpinning include cracking in brickwork and internal walls, doors and windows that stick or no longer close, sloping or bouncing floors, gaps opening at skirtings or cornices, and visible separation between sections of the building. These symptoms often point to differential foundation movement that will keep progressing until the cause is addressed.
Every underpinning project should start with diagnosis, not a quote. The cause of movement, drainage, soil, trees, plumbing leaks or original construction, determines the right remedy. We coordinate the structural engineer, confirm the scope, handle any council requirements and carry out the work to the engineer's design, with records kept at every stage.

Approval rules depend on Georges River Council's controls and your site. We check them for your address and handle any application.
METCON (Meteora Constructions) brings 40+ years of structural and construction experience to Hurstville and the St George. We are a fully licensed NSW builder, Builder Licence 384697C, DBP Registration BUP4254812, and we run every job the same disciplined way: diagnosis first, structural engineer coordinated, clear written scope, compliant execution and full documentation at handover.
For Hurstville clients that means no guesswork and no shortcuts. We provide a free, no-obligation site assessment and written quote, we coordinate the engineer and any approvals so you are not chasing multiple parties, and we keep one point of responsibility from first call to final sign-off. Explore our full underpinning service for more detail.
Real reviews from homeowners, strata and builders.
I called three builders and METCON were the only ones who actually came to look at the site before quoting. Honest pricing, no surprises.
They handled the DA, the engineer, and the build. We didn't have to chase council once. Massive wall, done in under two weeks.
We got three quotes. METCON was not the cheapest but was clearly the most thorough. Worth every dollar.
Straight answers from the builder. Anything else, just call.
Common signs include cracking in brick or internal walls, doors and windows that stick, sloping or uneven floors, and gaps opening at skirtings or cornices. In Hurstville, older housing stock and reactive soils make foundation movement more common. The only way to be sure is a proper assessment, we coordinate a structural engineer to diagnose the cause before recommending any work.
Underpinning cost depends on the cause of movement, the depth required, access to the site and how much of the building is affected. It can range from a few thousand dollars for a localised repair to a major structural project. We provide a free, no-obligation assessment and a clear written quote once the cause and scope are confirmed.
Underpinning is typically remedial structural work and requirements vary depending on the scope and the property. Some work proceeds under engineering certification, while more significant works may have additional requirements. We handle the engineering coordination and any approvals needed so the job is compliant from the start.
We work right across St George and the rest of Sydney. See all service areas.
Free site assessment and a straight answer from a licensed Sydney builder.