Looking for retaining walls in Kingsgrove? METCON is a licensed Sydney builder delivering retaining walls across Kingsgrove and the wider St George. A retaining wall holds back soil, manages level changes and protects what sits above and below it. On sloping or coastal blocks, a well-built retaining wall is structural infrastructure, and when one fails, it can take driveways, gardens and even building foundations with it.
Kingsgrove is our home base, and we know its blocks well, many on the reactive clay soils common across the St George and Canterbury region. Level changes between properties, established gardens and ageing foundations make retaining walls and groundworks a regular requirement. Being local means we are on site quickly and we know the ground.
We build the full range of retaining walls, concrete sleeper, reinforced concrete, sandstone, timber, gabion and engineered solutions, matched to the site rather than sold as a one-size-fits-all product. The right choice depends on wall height, soil conditions, drainage, surcharge loads from vehicles or structures above, access and the finish you want.
The difference between a wall that lasts and one that fails is rarely the material. It is the engineering, the footings, the drainage behind the wall and the quality of construction. A wall that looks fine on day one can lean, crack or fail within a few years if hydrostatic pressure has nowhere to go or the footings were never designed for the load.
For walls over certain heights or near boundaries and structures, engineering and council approval may be required. We handle that coordination, design the drainage properly, and build to standard, so the finished wall is compliant, documented and dependable for the long term.

Approval rules depend on Georges River's controls and your site. We check them for your address and handle any application.
We recommend the system that suits your Kingsgrove block: height, soil, drainage, loads and the finish you want.
METCON (Meteora Constructions) brings 40+ years of structural and construction experience to Kingsgrove and the St George. We are a fully licensed NSW builder, Builder Licence 384697C, DBP Registration BUP4254812, and we run every job the same disciplined way: diagnosis first, structural engineer coordinated, clear written scope, compliant execution and full documentation at handover.
For Kingsgrove clients that means no guesswork and no shortcuts. We provide a free, no-obligation site assessment and written quote, we coordinate the engineer and any approvals so you are not chasing multiple parties, and we keep one point of responsibility from first call to final sign-off. Explore our full retaining walls service for more detail.
Real reviews from homeowners, strata and builders.
METCON replaced our failing timber wall with concrete sleepers. Straightforward quote, tidy site, and it looks fantastic.
I called three builders and METCON were the only ones who actually came to look at the site before quoting. Honest pricing, no surprises.
They handled the DA, the engineer, and the build. We didn't have to chase council once. Massive wall, done in under two weeks.
Straight answers from the builder. Anything else, just call.
Retaining wall cost depends on height, length, material, drainage requirements, site access and whether engineering and approvals are needed. A low garden wall is very different from an engineered structural wall on a sloping Kingsgrove block. We provide a free site assessment and a clear written quote.
It depends on the height, location and whether the wall carries surcharge loads. Lower walls on stable ground may not need approval, while taller walls or those near boundaries and structures often do. We assess this early and handle any engineering and approvals required for your Kingsgrove site.
There is no single best material, it depends on the site. Concrete sleepers offer a strong balance of durability and cost, reinforced concrete suits high loads, and sandstone or stone suit premium finishes. We recommend the right system for your Kingsgrove block after assessing height, soil, drainage and load.
We work right across St George and the rest of Sydney. See all service areas.
Free site assessment and a straight answer from a licensed Sydney builder.