Heritage restoration repairs an older building in a way that keeps its significance. It is different from renovation, which changes a building. For Sydney's Victorian, Federation and inter-war buildings, it combines traditional methods with modern structural and waterproofing knowledge.
What a restoration builder does
- Investigates: how the building was built and why it is failing.
- Works with heritage advisers: to understand what is significant.
- Helps with approvals: council or heritage requirements. See heritage approvals.
- Uses suitable materials: lime mortars, matching bricks, stone and timber.
- Repairs structure carefully: with engineers where needed.
- Records the work: photos and notes for owners and councils.

Typical heritage restoration work
- Brick and sandstone repairs. See sandstone restoration.
- Lime repointing and render. See lime vs cement render.
- Rising damp treatment. See rising damp.
- Verandah and balcony restoration. See verandahs.
- Chimneys, roofs and flashings. See chimneys.
- Structural repairs to footings, lintels and walls.
The guiding principle
Do as much as necessary, but as little as possible. Repair rather than replace, and match original materials so the building keeps its character.
Commercial and strata heritage buildings
Heritage hotels, pubs and apartment buildings add tenants, strata and sometimes DBP Act requirements. See heritage pubs and hotels and Art Deco balconies.
How restoration helps
Good restoration protects the building for future generations and keeps the character that gives it its value.
Heritage restoration in Sydney
We restore heritage homes and buildings across Sydney. See our heritage restoration service. Call 0415 840 500 or book a free inspection.
Frequently asked questions
What is heritage building restoration?
Repairing an older building in a way that keeps its heritage significance, using suitable materials and methods.
Is restoration different from renovation?
Yes. Restoration repairs and conserves the building, while renovation changes it.
Do I need approval to restore a heritage building?
It depends on the listing and the work. Many repairs need council or heritage approval, so check early.


