Sydney's Art Deco and inter-war apartment buildings, common in suburbs like Potts Point, Elizabeth Bay, Bondi and Dulwich Hill, often have curved rendered balconies, steel railings and decorative details. They are now around a century old.
Common problems
- Thin concrete with rusting steel, causing cracks and spalling.
- Rendered balustrade walls cracking and drumming.
- Steel railings and window frames rusting.
- No membrane, or old membranes long past their life.
- Cement patches that don't match.

Repairing with character
- Match render profiles, curves and textures.
- Repair or replicate original railings where possible.
- Keep original tiles or choose sympathetic replacements. See balcony tiles.
- Coatings that suit the building's colour scheme.
Waterproofing old balconies
Adding a modern membrane may need careful detailing at door sills and edges, where heights are limited. See upstands.
Approvals
Many Art Deco buildings are in heritage conservation areas or listed. Check council requirements, especially for changes in appearance. See heritage approvals.
How restoration helps
Careful repairs keep the building safe and dry and protect the character that buyers pay a premium for. See Art Deco flats.
Heritage balcony repairs
We repair Art Deco and inter-war balconies with methods that suit the building. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
Can Art Deco balconies be repaired without losing their character?
Yes. Matching render, profiles and railings keeps the original look.
Do Art Deco balcony repairs need council approval?
Sometimes, especially in conservation areas or where the appearance changes. Check with council.
Why do old Art Deco balconies crack?
Thin concrete over rusting steel, cracked render and water getting in are common causes.


