Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Remedial

Chimney Repairs for Older Homes: Cracks, Leaks and Leaning

4 November 2026 · 4 min read · By the METCON team

Most Sydney homes built before the 1950s have at least one brick chimney, and many are no longer used. Because nobody looks at them, problems build up until there is a leak or a crack, or a piece falls.

Common chimney problems

  • Eroded mortar: joints washed out by a century of weather.
  • Cracking: from movement, rusted steel and salt damage.
  • Leaning: often from mortar decay on the weather side or movement in the house below.
  • Failed flashings where the chimney meets the roof, causing ceiling leaks.
  • Damaged or missing cappings, letting rain down the flue.
  • Damp on walls around fireplaces.
Old brickwork with worn mortar joints.
Old brickwork with worn mortar joints.

Is it dangerous?

A leaning, badly cracked or loose chimney can fall in high winds, through the roof or onto a path. If you see loose bricks or a noticeable lean, keep people clear and get it checked promptly.

Repair options

Repointing

Raking out and repointing with suitable mortar, lime for older chimneys. See lime vs cement.

Flashing replacement

New lead or metal flashings dressed and sealed to stop roof leaks.

Capping

Repairing cappings or fitting a cowl or cap to keep rain out of unused flues.

Partial rebuild

Taking down and rebuilding the top section with the original bricks where it has cracked or leaned.

Removal

Removing a chimney above the roof line is sometimes chosen for unused chimneys, but in heritage areas it usually needs approval because chimneys are part of the streetscape. See heritage approvals.

Safety and access

Chimney work is work at height on a roof and needs edge protection or scaffold. It is not a DIY job.

How the right repair helps your home

A sound chimney keeps rain out of ceilings and walls, removes a falling hazard and keeps an important heritage feature of the house.

Chimney and brickwork repairs

We repair chimneys and heritage brickwork on older homes across Sydney. METCON is a licensed builder (384697C) with heritage and structural remedial experience across Sydney. Call 0415 840 500 or book a free inspection.

Frequently asked questions

Why is my chimney leaning?

Usually because the mortar has eroded more on the weather side, or the structure below has moved. A leaning chimney should be inspected promptly.

Why does my ceiling leak next to the chimney?

Most often failed flashings where the chimney meets the roof, or a missing capping letting water down the flue.

Can I remove an old chimney?

Sometimes, but in heritage areas it usually needs council approval because chimneys are part of the streetscape.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Structural Remediation
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote