Warehouse Conversion Apartments: Common Remedial Problems

4 November 2026 · 4 min read · By the METCON team

Converted warehouses and woolstores are some of Sydney's most sought-after apartments, particularly around Pyrmont, Ultimo, Surry Hills and Redfern. But they combine old industrial structures with newer apartment work, and the two do not always age well together.

Why conversions are different

These buildings were designed to store goods, not to keep people dry and comfortable. Many have thick masonry walls with no cavity, big old windows, long roofs and timber or steel frames. During conversion, bathrooms, balconies, rooftop additions and new services were added into that old structure.

A corroded steel beam of the kind found in older buildings.
A corroded steel beam of the kind found in older buildings.

Common problems

Roofs and box gutters

Long roofs and internal box gutters can overflow in heavy rain, sending water deep into the building. See box gutter leaks.

Solid brick walls

Without a cavity, solid walls depend on thickness and good mortar to manage water. Failed joints and impermeable coatings can leave walls damp. See water coming through brick walls.

Parapets

Old parapets crack and take in water from the top. See parapet leaks and capping.

Rusted steel

Steel lintels, beams and window frames embedded in masonry expand as they rust, cracking the wall around them. See lintel replacement and corroded steel beams.

Timber beam ends

Beams built into damp brick walls can rot where they sit in the wall. A problem here may need an engineer's input.

Added balconies, terraces and wet areas

Rooftop additions and new balconies rely on waterproofing and flashings joining new work to old. These junctions are common sources of leaks. See roof terrace waterproofing.

Heritage and approvals

Many converted warehouses are heritage listed or in conservation areas. Repairs often need matching materials and sometimes approval. Painted or sealed brick may also need special care. See heritage repairs and approval and lime vs cement.

Is it Class 2 work?

If the building contains apartments, it is likely to be a Class 2 building, or partly one, so DBP Act requirements may apply to certain repairs. See the DBP Act and remedial work.

How remedial work helps

  • Keeps the character that gives the apartments their value.
  • Stops water damage inside apartments and shared areas.
  • Protects the original structure for another generation.

Repairs for conversions

We work with engineers and heritage advisers to repair old fabric and newer additions together. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.

Frequently asked questions

Why do warehouse conversion apartments leak?

Common causes are box gutters, parapets, solid brick walls, rusted steel and the junctions between new additions and the old building.

Can original brick in a warehouse be repaired?

Yes. Bricks can be replaced with matching ones and repointed in a suitable mortar, with care around any heritage controls.

Are warehouse conversions Class 2 buildings?

Most residential conversions are at least partly Class 2, so the DBP Act may apply to some work. A registered practitioner can confirm this.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Structural Remediation
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote