Victorian terraces, mostly built from the mid-1800s to around 1900, line the streets of Paddington, Surry Hills, Glebe, Balmain, Newtown, Redfern and many other suburbs. Their narrow fronts, shared walls and long, thin plans create a particular set of problems.
Rising damp
Many terraces have no damp course or one that has failed. Damp shows on ground floor walls, especially party walls and the front wall. See rising damp treatment costs.

Party walls
The wall shared with next door carries both houses. Cracks, damp and parapet leaks on party walls often need the neighbour's cooperation and, sometimes, a dilapidation report. See dilapidation reports.
Box gutters and parapets
Many terraces have hidden box gutters behind parapets. When they block or rust, water goes straight into the walls and ceilings. See box gutter leaks and parapet leaks.
Front balconies
First floor balconies with cast iron lace, timber floors or tiled concrete leak into the room below and rot their supports. See terrace balcony restoration.
Cracking and movement
Shallow footings on clay or fill, leaking old drains and missing lintels cause cracking, especially at the rear. See signs you may need underpinning.
Rear additions
Lean-to kitchens and bathrooms added later often have poor footings, flat roofs and failed flashings where they meet the original house.
Brickwork and render
Lime mortar wears and cement repairs damage soft bricks. Front facades often have stucco or render details that need careful patching. See lime vs cement.
Strata-titled terraces
Some terraces have been converted into strata units. Then the roof, walls and balconies are usually common property, and the owners corporation manages repairs. See who is responsible in strata.
Heritage rules
Most terrace suburbs are heritage conservation areas. Repairs to street-facing parts often need approval. See heritage repair approvals.
How the right repairs help
Fixing water entry, damp and movement protects the original plaster, joinery and brickwork, makes the house drier and healthier, and protects its value in a market that pays for character.
Terrace remedial repairs
We repair terraces across inner Sydney and the Eastern Suburbs. METCON is a licensed builder (384697C) with heritage and structural remedial experience across Sydney. Call 0415 840 500 or book a free inspection.
Frequently asked questions
Why is my terrace damp on the ground floor?
Many terraces have no damp course or one that has failed, and party walls and front walls draw moisture from the ground. Leaking gutters can add to it.
Who pays to fix a shared party wall?
Usually both owners share the cost of repairs that benefit both properties. Talk to your neighbour early, and get advice if you cannot agree.
Do I need approval to repair my terrace?
In a heritage conservation area, repairs to street-facing parts often need approval, though like-for-like maintenance may be simpler. Check with council.


