Home owners in NSW have strong protection that does not depend on what the contract says. The Home Building Act 1989 implies statutory warranties into residential building work. If the work breaches them, you can claim against the builder, and later owners can usually claim too.
The six warranties
Section 18B says the builder warrants that:
- The work will be done with due care and skill, and in line with the plans and specifications in the contract.
- All materials supplied will be good and suitable for their purpose, and new unless otherwise stated.
- The work will comply with the Home Building Act and any other law.
- The work will be done with due diligence, and within the contract time or a reasonable time.
- If the work is a dwelling or its alteration, it will result in a dwelling reasonably fit for occupation.
- The work and materials will be reasonably fit for any purpose, or result, the owner made known to the builder.
How long you have
| Type of defect | Warranty period |
|---|---|
| Major defect | 6 years from completion |
| Any other defect | 2 years from completion |
See what counts as a major defect and time limits for claims against a builder.
What you must prove
- The work was residential building work covered by the Act.
- The defect exists, with photos and a description.
- Which warranty it breaches, and why.
- When the work was completed, for the time limit.
- If you say it is a major defect, each part of the major defect test.
- What it will cost to fix.
An expert report does most of this. A fixed-price, itemised rectification quote proves the cost.
Who can claim
The original owner, and in most cases later owners, can rely on the warranties. Owners corporations can claim for common property in strata buildings. See strata defect claims.
Common breaches we see
- Shower and balcony waterproofing that leaks within a few years.
- Falls the wrong way, so water ponds against doors.
- Cracking from poor slab or footing work.
- Missing flashings and cavity weep holes.
- Work that does not match the approved plans.
Reports and quotes for warranty claims
We prepare defect reports that tie each item to the warranty it breaches, with itemised rectification costs. METCON is a licensed builder (384697C) and DBP registered (BUP4254812), and we fix building defects for a living. Call 0415 840 500 or request a report or quote. We confirm a fixed fee in writing before we start.
This article is general information, not legal advice. For your situation, speak to a lawyer, NSW Fair Trading or the Tribunal.
Frequently asked questions
Can the contract exclude the statutory warranties?
No. The warranties are implied by the Act, and a contract term that tries to exclude or restrict them has no effect.
Do the warranties cover owner-builder work?
Owner-builder work can carry warranties for later buyers in some cases. The rules differ, so get advice on your situation.
What if I only noticed the defect after two years?
If it is a major defect, the six year period may still be open. Get the defect assessed against the major defect test quickly.