Defect or Maintenance? Sorting Problems in a Strata Building

19 November 2026 · 4 min read · By the METCON team

In a newer apartment building, the question comes up again and again. Is this leak, crack or failure a building defect that the developer or builder must fix? Or is it maintenance that the owners corporation must pay for? Getting the answer right can be worth a lot of money.

The basic difference

Building defectMaintenance item
Caused by defective design, workmanship or materials, or non-complianceCaused by normal use, age or lack of upkeep
Was wrong when built, even if it showed up laterWas right when built
Builder or developer responsible, within warranty periodsOwners corporation responsible

Common grey areas

  • Sealants: sealants wear out and need replacing, but sealants that failed in two years because the joint was designed or installed wrongly are a defect.
  • Blocked drains: leaves are maintenance. Drains with wrong falls or too small for the roof area are a defect.
  • Cracked tiles: impact damage is not a defect. Tiles cracking because the substrate moves is.
  • Balcony leaks: a membrane damaged by an owner's planter is not the builder's fault. A membrane with low upturns is.

Why maintenance records matter

Builders defending claims often argue the owners corporation did not maintain the building. A maintenance schedule, followed and recorded, removes that argument. See maintenance schedules.

Do not wait

Warranty periods run from completion: two years for most defects and six years for major defects. If you are unsure, get it assessed early. See defect reports before warranties expire.

How an expert decides

An expert looks at the cause, the plans and specifications, the Building Code and standards, the manufacturer's requirements and the maintenance records, and explains the reasons for their view. That is what a builder, developer or Tribunal will respond to.

Defect reports for strata

We prepare strata defect reports that sort defects from maintenance, with fixed-price rectification costs. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or request a report or quote. Report fees are fixed and agreed in writing before we start.

Frequently asked questions

Can a maintenance item also be a defect?

Yes, if poor design or workmanship made it fail early. The cause decides it.

Does the building manual tell us what maintenance is needed?

It should. For newer buildings, the developer usually provides a building manual and maintenance schedule. Follow and record it.

What if the developer says we caused the problem?

Ask for their reasons in writing, and get an independent expert opinion on the cause.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote