Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Strata

Apartment Building Maintenance Schedule: What to Check

9 November 2026 · 4 min read · By the METCON team

Many large remedial projects start with something small: a blocked balcony drain, a split sealant joint or leaves in a box gutter. A regular maintenance schedule catches these early and can save owners a lot of money.

Every few months

  • Clear roof gutters, box gutters and rainwater heads, more often near big trees. See box gutters.
  • Check roof and podium drains and outlets.
  • Check basement sumps and pumps are working, including alarms.
  • Walk through car parks looking for new drips and stains.
Staining from a leaking balcony, which regular checks can catch early.
Staining from a leaking balcony, which regular checks can catch early.

Every year

  • Roof inspection: membranes, flashings, penetrations and plant supports. See flat roofs.
  • Balcony drains and overflows, ideally with residents' help. See water pooling on balconies.
  • Balustrades and fixings. See balustrades.
  • Planters and garden areas over car parks. See planter boxes.
  • Visual check of facades from the ground for cracks, rust stains and drummy render.
  • Car park deck coatings and expansion joints. See car park coatings.

Every three to five years

  • A full condition report. See condition reports.
  • Close inspection of facades, slab edges and balconies, using access where needed.
  • Sealant review: windows, joints and junctions. See sealants.
  • Update the capital works fund plan. See capital works planning.

After big storms

  • Check roofs, gutters, drains and basements.
  • Ask residents to report new leaks quickly.
  • Record and photograph anything new. See storm damage repairs.

Who does what

Building managers or caretakers can handle routine checks. Specialists should handle roof access, facade inspections and anything at height. Residents can help by keeping balcony drains clear and reporting leaks.

How regular maintenance helps

A well-maintained building has fewer emergencies, lower long-term costs and better values. It also gives buyers confidence when they read the strata records.

Building inspections and repairs

We can inspect your building, set up a maintenance list and carry out repairs when needed. Call 0415 840 500 or book a free inspection.

Frequently asked questions

How often should apartment building gutters be cleaned?

At least a few times a year, and more often near trees or before storm season.

How often should a strata building have a condition report?

Every three to five years is a common guide, with simple annual checks in between.

What maintenance prevents balcony leaks?

Keeping drains and overflows clear, checking sealants and door sills, and fixing cracked tiles or pooling water early.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote